WELL · 42-197-30286 · DISTRICT 9
O'Neal, Albert #1
Hardeman County · Vertical
O'Neal, Albert #1 (API 42-197-30286) is a plugged well in Hardeman County, plugged October 19, 1978, last operated by Kohler Energy Corporation.
The RRC has issued 2 drilling permits between 1978 and 1986, permitted to 9,000 ft.
Completion filings report 4 formation tops, including Canyon, Palo Pinto, Barnett, Meramec.
Operator of record
Dallas, TX · P-5 Y, filed Sep 2, 1995 · 46 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Kohler Energy CorporationMay 1, 1986 |
- 9,000
- total depth, ft
- 2
- permits on file
- May 1, 1986
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 19, 1978
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-13-27212 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 301722-99 | Other | Kohler Energy Corporation | Aug 6, 1986 | May 1, 1986 | — | 9,000 |
| 30928-99 | Drill | Miller Brothers | Aug 21, 1978 | Aug 21, 1978 | — | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27212 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,429 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonCANYON LIME | 4,355 | -2,926 |
| Palo PintoPALO PINTO LM | 5,740 | -4,311 |
| BarnettBARNETT SHALE | 8,180 | -6,751 |
| Meramec | 8,440 | -7,011 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,830 | 5,844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 404 | — | — |
| 4.5 | 8,785 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 15, 1988 | Aug 8, 1986 | Yes |
| 00 | Nov 29, 1988 | — | — |
| 00 | Aug 25, 1986 | Aug 8, 1986 | Yes |
| 00 | Aug 22, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-30286 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-30286 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19730286, documented in the API reference.