WELL · 42-197-30805 · DISTRICT 9

Mabrey SWD #1

WaterY

Hardeman County · Quanah field · Shut IN  · Vertical

Mabrey Swd #1 (API 42-197-30805) is a well in Hardeman County operated by Sutherland Energy CO. LLC, completed December 12, 2012 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued December 7, 1984, permitted to 3,700 ft.

It was permitted by Madison Oil CO.-Halbouty, M. T. and has since transferred to Sutherland Energy CO. LLC on the wellbore schedule.

Completion filings report one formation top, including Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Sutherland Energy Co. LLC

Permitted by Madison Oil Co.-Halbouty, M. T.; the EWA schedule now lists a different operator.

Bridgeport, TX · P-5 Y, filed Mar 4, 2026 · 18 permits on file · (940) 389-6165

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSutherland Energy Co. LLC
Production reportsnone
Latest permitMadison Oil Co.-Halbouty, M. T.Dec 7, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,700
total depth, ft
1
permits on file
Dec 7, 1984
last permit issued
Dec 12, 2012
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mabrey SWD O-13-25450QuanahSutherland Energy Co., LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
260119-99DrillMadison Oil Co.-Halbouty, M. T.Nov 15, 1984Dec 7, 1984—3,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25450————

Formation tops

As filed on W-2/G-1. Subsea from 1,525 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon2,972-1,447

Perforations

Perforated and open-hole intervals.

FromToType
2,7942,804Perforated
2,7942,832Perforated
2,8242,832Perforated
2,9723,011Perforated
3,2223,230Perforated
3,4053,417Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51857.875185 S
8.62520012.25300 S
8.62522012.25200 S
43,4705.5250 S
5.53,4987.875110 S
5.53,5007.875185 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 11, 2023Apr 16, 2023—
00Jun 28, 2013Jan 22, 2013—
00Jun 5, 2008Aug 31, 2007—
00Aug 7, 1985Jul 11, 1985—
00Jul 30, 1985Jul 11, 1985—
00Jul 23, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.77M
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057339W-14 DisposalActive1,0009502,770–3,430

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730805, documented in the API reference.