WELL · 42-197-30901 · DISTRICT 9

Howard D #1

Plugged

Hardeman County · Hurt Dog (Canyon) field  · Vertical

Howard D #1 (API 42-197-30901) is a plugged well in Hardeman County, plugged July 11, 2012, last operated by Dimock Operating Company.

The RRC has issued 2 drilling permits between 1985 and 2006, permitted to 9,000 ft.

It was permitted by TE-Ray Resources, Inc and has since transferred to Dimock Operating Company on the wellbore schedule.

Completion filings report 6 formation tops, including Noble, Canyon, Palo Pinto, Rasberry.

Its 2 leases have reported 27.4K barrels of oil and 5.23K mcf of gas since January 1993, last reporting in August 2016. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Dimock Operating Company

Permitted by TE-Ray Resources, Inc; the EWA schedule now lists a different operator.

Frisco, TX · P-5 Y, filed Feb 4, 2026 · 6 permits on file · (940) 235-8991

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDimock Operating Company
Production reportsDimock Operating Companythrough May 2007
Latest permitTE-Ray Resources, IncMar 27, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
Mar 27, 2006
last permit issued
Apr 1, 2006
completed
27.4K
cumulative oil, bbl
5.23K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 2006
Shut in
—
Plugged
Jul 11, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Howard "D" O-13-30649Hurt Dog (Canyon)Dimock Operating Company14820Apr 2006 – Aug 2016
Howard "D" O-13-25833Hurt Dog (Chappel)Dimock Operating Company126.9K5.23KJan 1993 – Sep 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyFeb 1993 → Jul 1995
  2. 2Trio Operating Company, Inc.Aug 1995 → Dec 2001
  3. 3Trio Consulting & Management,llcJan 2002 → May 2005
  4. 4TE-Ray Resources, Inc.Aug 2005 → Mar 2006
  5. 5Dimock Operating CompanyNov 2006 → May 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
616143-99RecompletionTE-Ray Resources, IncMar 20, 2006Mar 27, 2006Mar 9, 20068,374
287551-99DrillPhillips Petroleum CompanyOct 11, 1985Oct 14, 1985—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-25833————
—— O-13-30649————

Formation tops

As filed on W-2/G-1. Subsea from 1,499 ft elevation.Download CSV →

FormationMD ftSubsea
Noble4,494-2,995
CanyonCANYON LIME5,388-3,889
Palo Pinto5,696-4,197
Rasberry6,448-4,949
Clean Lime7,662-6,163
Chappel8,200-6,701
Chappel8,250-6,751

Perforations

Perforated and open-hole intervals.

FromToType
5,5005,514Perforated
8,2518,282Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62567512.25530 S
5.58,3397.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 2007May 8, 2006Yes
00Sep 5, 2006Dec 20, 1985Yes
00Jan 7, 1986Dec 20, 1985Yes
00Jan 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730901, documented in the API reference.