TEXAS · WELLS · HARDEMAN COUNTY · API 42-197-30905 · DISTRICT 7C

Johnson H #1

Plugged

Hardeman County · Quanah field  · Vertical

Johnson H #1 (API 42-197-30905) is a plugged well in Hardeman County, plugged June 28, 1986, last operated by Burk Royalty Company.

The RRC has issued 2 drilling permits between 1985 and 1986, permitted to 9,000 ft.

Operator of record

Burk Royalty Company

Based in
Wichita Falls, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 12, 2001
Permits on file
552
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBurk Royalty CompanyMay 6, 1986
9,000
total depth, ft
2
permits on file
May 6, 1986
last permit issued
May 9, 1986
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 9, 1986
Shut in
—
Plugged
Jun 28, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
301886-99OtherBurk Royalty CompanyMay 6, 1986May 6, 1986—6,100
289389-99DrillBurk Royalty CompanyNov 4, 1985Nov 5, 1985Dec 20, 19859,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 9, 1986Johnson H O-13-26279QuanahBurk Royalty CompanyPlugged—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730905, documented in the API reference.