TEXAS · WELLS · HARDEMAN COUNTY · API 42-197-31270 · DISTRICT 09

Cato Unit #1

Plugged

Hardeman County  · Horizontal · Directional

Cato Unit #1 (API 42-197-31270) is a plugged horizontal well in Hardeman County, plugged December 31, 2004, last operated by Ampak Oil Company.

The RRC has issued 3 drilling permits between 1994 and 2004, permitted to 10,500 ft.

Operator of record

Ampak Oil Company

Based in
Plano, TX
P-5 status
Active (A)
P-5 last filed
Aug 6, 2025
Permits on file
223
Phone
(972) 422-4144

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitAmpak Oil CompanyJul 22, 2004
10,500
total depth, ft
3
permits on file
Jul 22, 2004
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 31, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
548115-99ReenterAmpak Oil CompanyJul 12, 2004Jul 22, 2004Aug 18, 200410,500
478322-99ReenterKey Energy of Colorado, Inc.Jul 28, 1998Jul 28, 1998Jul 29, 19989,000
419286-99DrillMariah Energy Corp.Dec 13, 1993Jan 13, 1994Apr 14, 19948,800

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731270, documented in the API reference.