WELL · 42-197-31283 · DISTRICT 9
Huie-Emerson #1
Hardeman County · Huie-Emerson Cox (Chappel) field · Vertical
Huie-Emerson #1 (API 42-197-31283) is a plugged well in Hardeman County, plugged February 14, 2000, last operated by Thompson Richard W. Inc..
The RRC has issued one drilling permit, issued April 8, 1994, permitted to 8,900 ft.
Completion filings report 7 formation tops, including Canyon, Palo Pinto, Barnett, Chester.
Its lease has reported 84.4K barrels of oil and 3.32K mcf of gas since May 1994, last reporting in April 2000. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Plano, TX · P-5 Y, filed Aug 4, 2025 · 68 permits on file · (214) 733-7204
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Thompson Richard W. Inc. |
| Production reports | Thompson, Richard W. Inc.through Feb 2000 |
| Latest permit | Thompson, Richard W. Inc.Apr 8, 1994 |
- 8,900
- total depth, ft
- 1
- permits on file
- Apr 8, 1994
- last permit issued
- Nov 14, 1995
- completed
- 84.4K
- cumulative oil, bbl
- 3.32K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Apr 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 14, 1995
- Shut in
- —
- Plugged
- Feb 14, 2000
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Huie-Emerson O-13-28792 | Huie-Emerson Cox (Chappel) | Thompson, Richard W. Inc. | 2 | 84.4K | 3.32K | May 1994 – Apr 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thompson, Richard W. Inc.May 1994 → Feb 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422808-99 | Drill | Thompson, Richard W. Inc. | Apr 7, 1994 | Apr 8, 1994 | Apr 16, 1994 | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-28792 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,423 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 5,386 | -3,963 |
| Palo Pinto | 5,570 | -4,147 |
| BarnettBARNETT SHALE | 8,073 | -6,650 |
| Chester | 8,112 | -6,689 |
| Meramec | 8,266 | -6,843 |
| Meramec Lime | 8,266 | -6,843 |
| Chappel | 8,344 | -6,921 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,478 | 8,479 | Perforated |
| 8,489 | 8,510 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 549 | 12.25 | 210 S |
| 4.5 | 8,489 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 1996 | Jan 5, 1996 | — |
| 00 | Jun 23, 1994 | May 31, 1994 | Yes |
| 00 | Jun 14, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31283 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31283 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731283, documented in the API reference.