WELL · 42-197-31430 · DISTRICT 9
Nichols Unit #1
Hardeman County · Apex (Mississippian) field · Vertical
Nichols Unit #1 (API 42-197-31430) is a plugged well in Hardeman County, plugged June 24, 2010, last operated by Key Energy Of Colorado Inc..
The RRC has issued 2 drilling permits between 1998 and 2001, permitted to 9,000 ft.
Completion filings report 3 formation tops, including Canyon, Caddo, Barnett.
Operator of record
Tulsa, OK · P-5 Y, filed Jun 3, 2016 · 78 permits on file · (800) 969-4789
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Key Energy of Colorado Inc. |
| Production reports | none |
| Latest permit | Key Energy of Colorado, Inc.May 17, 2001 |
- 9,000
- total depth, ft
- 2
- permits on file
- May 17, 2001
- last permit issued
- Mar 27, 1998
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Jan 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 27, 1998
- Shut in
- —
- Plugged
- Jun 24, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nichols Unit O-13-29967 | Apex (Mississippian) | Key Energy of Colorado, Inc. | 1 | 0 | 0 | Apr 2001 – Jan 2011 |
| Nichols Unit O-13-29503 | Wildcat | Key Energy of Colorado, Inc. | 1 | 0 | 0 | Mar 1998 – Dec 2001 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 509128-99 | Recompletion | Key Energy of Colorado, Inc. | Feb 3, 1998 | May 17, 2001 | Feb 11, 1998 | 9,000 |
| 472903-99 | Drill | Key Energy of Colorado, Inc. | Feb 3, 1998 | Feb 9, 1998 | Feb 11, 1998 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29503 | — | — | — | — |
| — | — O-13-29967 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,420 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,577 | 8,634 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 505 | 12.25 | 240 S |
| 5.5 | 8,577 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 2002 | Dec 6, 2001 | — |
| 00 | Dec 10, 2001 | May 21, 1998 | Yes |
| 00 | Jun 10, 1998 | May 21, 1998 | Yes |
| 00 | May 27, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31430 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31430 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.99M
- bbl, all reported
- Feb 2011
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000089728 | W-14 Disposal | Plugged Jul 19, 2010 | 15,000 | 4,100 | 8,200–8,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731430, documented in the API reference.