WELL · 42-197-31437 · DISTRICT 9

Hurst #1

N

Hardeman County  · Horizontal · Sidetrack

Hurst #1 (API 42-197-31437) is a permitted horizontal well in Hardeman County filed by Trio Operating Company, Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits (amended once) between 1998 and 2000, permitted to 8,800 ft.

Completion filings report 3 formation tops, including Noble, Palo Pinto, Mississippian.

Its lease has reported 577 barrels of oil since June 1998, last reporting in June 2000.

Operator of record

Trio Operating Company, Inc.

Based in
Wichita Falls, TX
P-5 status
Inactive (I)
P-5 last filed
Oct 3, 2001
Permits on file
203
Phone
(940) 767-2847

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTrio Operating Company, Inc.through Jan 2000
Latest permitTrio Operating Company, Inc.Jan 24, 2000
8,800
total depth, ft
3
permits on file
Jan 24, 2000
last permit issued
—
completed
577
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Jun 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hurst O-13-29546Rio (Chappel)Trio Operating Company, Inc.15770Jun 1998 – Jun 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Trio Operating Company, Inc.Jun 1998 → Jan 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491340-99Recompletion · sidetrackTrio Operating Company, Inc.Jan 24, 2000Jan 24, 2000—8,700
475452-98DrillTrio Operating Company, Inc.Jul 29, 1998Apr 24, 1998May 1, 19988,800
475452-99DrillTrio Operating Company, Inc.Apr 20, 1998Apr 24, 1998—8,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29546————

Formation tops

As filed on W-2/G-1. Subsea from 1,565 ft elevation.Download CSV →

FormationMD ftSubsea
Noble4,190-2,625
Palo Pinto5,800-4,235
MississippianMISS.8,060-6,495

Perforations

Perforated and open-hole intervals.

FromToType
8,6568,680Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62554812.25275 S
5.58,6567.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 2, 1998Aug 4, 1998Yes
00Aug 28, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731437, documented in the API reference.