WELL · 42-197-31582 · DISTRICT 9
Watson 133 #1H
Hardeman County · Medicine Mound W. (Holmes A) field · Horizontal
Watson 133 #1H (API 42-197-31582) is a plugged horizontal well in Hardeman County, plugged August 28, 2024, last operated by Trio Consulting & Management LLC.
The RRC has issued one drilling permit, issued May 23, 2005, permitted to 8,700 ft.
It was permitted by Texakoma E & P, LLC and has since transferred to Trio Consulting & Management LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Atoka, Barnett, Chester, Chappel.
Its lease has reported 27.5K barrels of oil since February 2006, last reporting in November 2024.
Operator of record
Trio Consulting & Management LLC
Permitted by Texakoma E & P, LLC; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 23, 2025
- Permits on file
- 351
- Phone
- (940) 767-2847
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trio Consulting & Management LLC |
| Production reports | Trio Consulting & Management,llcthrough Feb 2020 |
| Latest permit | Texakoma E & P, LLCMay 23, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,700
- total depth, ft
- 1
- permits on file
- May 23, 2005
- last permit issued
- Mar 17, 2006
- completed
- 27.5K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Nov 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 17, 2006
- Shut in
- —
- Plugged
- Aug 28, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Watson 133 O-13-30664 | Medicine Mound, W. (Holmes A) | Trio Consulting & Management,llc | 1 | 27.5K | 0 | Feb 2006 – Nov 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texakoma Operating, L.P.Feb 2006 → Nov 2013
- 2Trio Consulting & Management,llcMay 2014 → Feb 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600934-99 | Drill | Texakoma E & P, LLC | May 19, 2005 | May 23, 2005 | Jul 10, 2005 | 8,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 17, 2006 | Watson 133 O-13-30664 | Medicine Mound W. (Holmes A) | Trio Consulting & Management LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,605 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,356 | 7,364 | Perforated |
| 7,496 | 7,527 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 394 | 12.25 | 230 S |
| 5.5 | 8,262 | 7.875 | 730 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 15, 2007 | Mar 23, 2006 | Yes |
| 00 | Oct 4, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31582 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31582 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731582, documented in the API reference.