WELL · 42-197-31600 · DISTRICT 9
Cato #1
Hardeman County · Redbird (Rogers) field · Vertical
Cato #1 (API 42-197-31600) is a plugged well in Hardeman County, plugged April 14, 2026, last operated by Texoma Oil Tools Inc..
The RRC has issued one drilling permit, issued December 27, 2005, permitted to 7,000 ft.
It was permitted by Bettis, Boyle & Stovall and has since transferred to Texoma Oil Tools Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Canyon, Raspberry, Congl., Basal Congl..
Its lease has reported 37.8K barrels of oil and 27.9K mcf of gas since June 2006, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Bettis, Boyle & Stovall; the EWA schedule now lists a different operator.
Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 1 permits on file · (940) 733-4511
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texoma Oil Tools Inc. |
| Production reports | Texoma Oil Tools, Inc.through May 2025 |
| Latest permit | Bettis, Boyle & StovallDec 27, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Dec 27, 2005
- last permit issued
- Jun 23, 2006
- completed
- 37.8K
- cumulative oil, bbl
- 27.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 23, 2006
- Shut in
- —
- Plugged
- Apr 14, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cato O-13-30652 | Redbird (Rogers) | Texoma Oil Tools, Inc. | 2 | 37.8K | 27.9K | Jun 2006 – Jul 2026 |
Oil, barrels lease total
Last 12 months 75 · prior 12 461(-84%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bettis, Boyle & StovallJun 2006 → Oct 2018
- 2Texoma Oil Tools, Inc.May 2019 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 611276-99 | Drill | Bettis, Boyle & Stovall | Dec 19, 2005 | Dec 27, 2005 | May 5, 2006 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30652 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,319 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 4,002 | -2,683 |
| Raspberry | 5,612 | -4,293 |
| Congl. | 6,140 | -4,821 |
| Basal Congl. | 6,483 | -5,164 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,141 | 6,151 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 485 | 12.25 | 290 S |
| 4.5 | 6,590 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 29, 2007 | Jul 11, 2006 | Yes |
| 00 | Sep 7, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31600 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31600 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731600, documented in the API reference.