WELL · 42-197-31614 · DISTRICT 9

Cato #2

Plugged

Hardeman County · Harwell (Raspberry) field  · Vertical

Cato #2 (API 42-197-31614) is a plugged well in Hardeman County, plugged April 16, 2026, last operated by Bettis Boyle & Stovall.

The RRC has issued 2 drilling permits between 2006 and 2008, permitted to 6,700 ft.

Completion filings report 5 formation tops, including Canyon, Raspberry, Conglomerate, Basil Conglomerate.

Its 2 leases have reported 41.2K barrels of oil and 29.7K mcf of gas since June 2006, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Bettis Boyle & Stovall

Graham, TX · P-5 Y, filed Oct 7, 2022 · 530 permits on file · (940) 456-2143

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBettis Boyle & Stovall
Production reportsTexoma Oil Tools, Inc.through May 2025
Latest permitBettis, Boyle & StovallJun 6, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
2
permits on file
Jun 6, 2008
last permit issued
Feb 2, 2007
completed
41.2K
cumulative oil, bbl
29.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 2, 2007
Shut in
—
Plugged
Apr 16, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cato O-13-30652Redbird (Rogers)Texoma Oil Tools, Inc.237.8K27.9KJun 2006 – Jul 2026
Cato O-13-30777Harwell (Raspberry)Bettis, Boyle & Stovall13.44K1.79KFeb 2007 – Nov 2008

Oil, barrels lease total

Last 12 months 75 · prior 12 461(-84%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bettis, Boyle & StovallJun 2006 → Oct 2018
  2. 2Texoma Oil Tools, Inc.May 2019 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
656591-99RecompletionBettis, Boyle & StovallMar 4, 2008Jun 6, 2008Jul 24, 20086,589
628436-99DrillBettis, Boyle & StovallNov 1, 2006Dec 12, 2006Jan 2, 20076,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-30652————
—— O-13-30777————

Formation tops

As filed on W-2/G-1. Subsea from 1,298 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon3,990-2,692
Raspberry5,534-4,236
Conglomerate6,092-4,794
Basil Conglomerate6,356-5,058
MississippianMISSISSIPPI6,528-5,230

Perforations

Perforated and open-hole intervals.

FromToType
5,5345,542Perforated
6,1046,120Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62548612.25290 S
4.56,5897.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 2008Aug 20, 2008Yes
00Nov 6, 2008——
00Jun 14, 2007Mar 5, 2007Yes
00Jun 12, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124540H-1 InjectionPlugged May 29, 20265002,7505,520–6,148

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731614, documented in the API reference.