WELL · 42-197-31640 · DISTRICT 9
SS-Embry #1
Hardeman County · Conley S. (Miss.) field · Vertical
SS-Embry #1 (API 42-197-31640) is a plugged well in Hardeman County, plugged June 27, 2011, last operated by Trio Consulting & Management LLC.
The RRC has issued one drilling permit (amended once), issued December 19, 2008, permitted to 8,700 ft.
Completion filings report 3 formation tops, including Palo Pinto, Atoka, Mississippian.
Its lease has reported 1.31K barrels of oil since August 2009, last reporting in December 2011.
Operator of record
Trio Consulting & Management LLC
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 23, 2025
- Permits on file
- 351
- Phone
- (940) 767-2847
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trio Consulting & Management LLC |
| Production reports | Trio Consulting & Management,llcthrough Aug 2010 |
| Latest permit | Trio Consulting & Management,llcDec 19, 2008 |
- 8,700
- total depth, ft
- 2
- permits on file
- Dec 19, 2008
- last permit issued
- Aug 18, 2009
- completed
- 1.31K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Dec 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 18, 2009
- Shut in
- —
- Plugged
- Jun 27, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| SS-Embry O-13-31467 | Conley, S. (Miss.) | Trio Consulting & Management,llc | 1 | 1.31K | 0 | Aug 2009 – Dec 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Trio Consulting & Management,llcAug 2009 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 676325-98 | Drill | Trio Consulting & Management,llc | Jul 24, 2009 | Dec 19, 2008 | Mar 16, 2009 | 8,700 |
| 676325-99 | Drill | Trio Consulting & Management,llc | Dec 15, 2008 | Dec 19, 2008 | Mar 16, 2009 | 8,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31467 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,520 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 5,360 | -3,840 |
| Atoka | 6,500 | -4,980 |
| MississippianMISS. LIME | 7,784 | -6,264 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,380 | 8,388 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 535 | 12.25 | 350 S |
| 5.5 | 8,393 | 7.875 | 280 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 22, 2010 | Oct 7, 2009 | Yes |
| 00 | Dec 30, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31640 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31640 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731640, documented in the API reference.