WELL · 42-199-00398 · DISTRICT 3
Nona Mills Field Unit #5001
Hardin County · Vertical
Nona Mills Field Unit #5001 (API 42-199-00398) is a permitted well in Hardin County filed by Smith Production Inc.; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1982 and 1998, permitted to 8,504 ft.
Completion filings report one formation top, including Yegua.
Its 2 leases have reported 32.5K barrels of oil and 300K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- The Woodlands, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 12, 2025
- Permits on file
- 433
- Phone
- (281) 296-5600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Western Energy Group, LLCthrough Mar 2020 |
| Latest permit | Smith Production Inc.Sep 25, 1998 |
- 8,504
- total depth, ft
- 4
- permits on file
- Sep 25, 1998
- last permit issued
- —
- completed
- 32.5K
- cumulative oil, bbl
- 300K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nona Mills Field Unit O-3-23568 | Nona Mills (-E- Sand) | Western Energy Group, LLC | 3 | 32.5K | 300K | Aug 1998 – Jul 2026 |
| Nona Mills Field Unit G-3-99096 | Nona Mills (-H-) | Smith Production Inc. | 1 | 0 | 0 | Jan 1993 – Aug 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Smith Production Inc.Aug 1998 → Sep 2002
- 2Westport Oil and Gas Company, LPOct 2002 → Sep 2005
- 3Synergy Oil & Gas, L.P.Jan 2007 → Aug 2007
- 4Primrose Resources, LLCDec 2011 → Nov 2015
- 5Western Energy Group, LLCDec 2015 → Mar 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 479622-99 | Recompletion | Smith Production Inc. | Sep 22, 1998 | Sep 25, 1998 | Aug 6, 1998 | 8,504 |
| 333652-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 28, 1987 | Sep 25, 1987 | — | 7,920 |
| 159973-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 6, 1982 | May 6, 1982 | — | 8,504 |
| 152836-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Mar 2, 1982 | Mar 2, 1982 | — | 8,504 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-99096 | — | — | — | — |
| — | — O-3-23568 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yegua | 7,100 | -7,085 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,708 | 7,715 | Perforated |
| 7,832 | 7,837 | Perforated |
| 7,970 | 7,976 | Perforated |
| 8,045 | 8,052 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,786 | — | 525 S |
| 2.375 | 7,960 | — | — |
| 2.375 | 8,031 | — | — |
| 5.5 | 8,343 | — | — |
| 5.5 | 8,389 | — | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 2, 1998 | Sep 22, 1998 | Yes |
| 00 | Sep 28, 1998 | — | — |
| 00 | Jan 13, 1988 | Dec 11, 1987 | — |
| 00 | Jan 12, 1984 | Mar 18, 1982 | — |
| 00 | Jan 12, 1984 | Sep 10, 1975 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-00398 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-00398 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19900398, documented in the API reference.