TEXAS · WELLS · HARDIN COUNTY · API 42-199-00403 · DISTRICT 03

Nona Mills Field Unit #3601

Plugged

Hardin County · Nona Mills (-E- Sand) field  · Vertical

Nona Mills Field Unit #3601 (API 42-199-00403) is a plugged well in Hardin County, plugged August 20, 2026, last operated by Western Energy Group LLC.

The RRC has issued 2 drilling permits (amended once) between 1986 and 1990, permitted to 8,590 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Western Energy Group LLC on the wellbore schedule.

Operator of record

Western Energy Group LLC

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Leander, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 2, 2020
Permits on file
5
Phone
(346) 570-5912

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsWestern Energy Group, LLCthrough Dec 2019
Latest permitMobil Producing TX. & N.M. Inc.Oct 17, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,590
total depth, ft
3
permits on file
Oct 17, 1990
last permit issued
Mar 26, 1999
completed
0
cumulative oil, bbl
237K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 26, 1999
Shut in
—
Plugged
Aug 20, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nona Mills Field Unit G-3-136446Nona Mills (-E- Sand)Western Energy Group, LLC10237KJan 1993 – Jul 2026
— G-3-43236——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith Production Inc.Nov 1998 → Sep 2002
  2. 2Westport Oil and Gas Company, LPOct 2002 → Jul 2004
  3. 3Primrose Resources, LLCNov 2013 → Nov 2015
  4. 4Western Energy Group, LLCAug 2016 → Dec 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
379244-98RecompletionMobil Producing TX. & N.M. Inc.Dec 12, 1990Oct 17, 1990—8,590
379244-99RecompletionMobil Producing TX. & N.M. Inc.Oct 10, 1990Oct 17, 1990—8,590
296399-99RecompletionMobil Producing TX. & N.M. Inc.Jan 24, 1986Jan 27, 1986—8,590

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 26, 1999Nona Mills Field Unit G-3-136446Nona Mills (-E- Sand)Western Energy Group LLCPlugged—
Mar 4, 1986Mills Nona Field Unit G-3-43236Nona Mills (-G-)Mobil Producing TX. & N.M. Inc.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
7,1467,154Perforated
7,1567,160Perforated
7,4307,434Perforated
7,4417,446Perforated
7,9547,966Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,696——
10.751,965——
10.751,968—575 S
5.58,300——
5.58,578——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 19, 1999Apr 27, 1999—
00Feb 13, 1991Dec 12, 1990Yes
00Jan 14, 1991——
00Aug 8, 1986Jul 16, 1986Yes
00Mar 31, 1986Mar 18, 1986Yes
00Jan 12, 1984Jan 22, 1968—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19900403, documented in the API reference.