TEXAS · WELLS · HARDIN COUNTY · API 42-199-00494 · DISTRICT 03

Hooks Esther et Al #6

Plugged

Hardin County · Nona Mills (-K-) field  · Vertical

Hooks Esther ET AL #6 (API 42-199-00494) is a plugged well in Hardin County, plugged July 2, 2026, last operated by Western Energy Group LLC.

The RRC has issued 2 drilling permits (amended once) between 1985 and 1991, permitted to 8,600 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Western Energy Group LLC on the wellbore schedule.

Completion filings report one formation top, including Yegua.

Operator of record

Western Energy Group LLC

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Leander, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 2, 2020
Permits on file
5
Phone
(346) 570-5912

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsWestern Energy Group, LLCthrough Dec 2019
Latest permitMobil Producing TX. & N.M. Inc.Jun 17, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,600
total depth, ft
3
permits on file
Jun 17, 1991
last permit issued
Dec 8, 1999
completed
0
cumulative oil, bbl
760K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 8, 1999
Shut in
—
Plugged
Jul 2, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hooks, Esther et Al G-3-140309Nona Mills (-K-)Western Energy Group, LLC10760KJan 1993 – Jul 2026
— G-3-51267——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Dec 1997
  2. 2Smith Production Inc.Jan 1998 → Jan 2000
  3. 3Primrose Resources, LLCJul 2012 → Nov 2015
  4. 4Western Energy Group, LLCDec 2015 → Dec 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
388990-98RecompletionMobil Producing TX. & N.M. Inc.Nov 5, 1991Jun 17, 1991Aug 29, 19918,552
388990-99RecompletionMobil Producing TX. & N.M. Inc.Jun 17, 1991Jun 17, 1991—8,552
269464-99RecompletionMobil Producing TX. & N.M. Inc.Mar 13, 1985Mar 14, 1985—8,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 8, 1999Hooks Esther et Al G-3-140309Nona Mills (-K-)Western Energy Group LLCPlugged—
Jan 29, 1985Nong Mills Field Unit G-3-51267Nona Mills (-G-)Mobil Producing TX. & N.M. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 13 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua7,070-7,057
YeguaYEGUA A7,150-7,137
YeguaYEGUA B7,200-7,187

Perforations

Perforated and open-hole intervals.

FromToType
7,1277,137Perforated
8,3828,420Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.5707—550 S
10.751,787——
5.57,897——
5.58,597——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 5, 2002Apr 19, 2000—
00Feb 5, 1992Jan 15, 1992Yes
00Jan 29, 1992——
00Sep 16, 1985Aug 12, 1985—
00Jan 12, 1984Oct 21, 1971—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19900494, documented in the API reference.