WELL · 42-199-32043 · DISTRICT 3

Black Stone Minerals #10

Y

Hardin County · Batson New field · Producing  · Vertical

Black Stone Minerals #10 (API 42-199-32043) is a well in Hardin County operated by Arrowhead Operating Inc., completed January 26, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 12, 1983, permitted to 8,500 ft.

It was permitted by Prairie Producing Company and has since transferred to Arrowhead Operating Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Vicksburg, Jackson, Yegua.

Its lease has reported 59.1K barrels of oil and 6.25K mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Arrowhead Operating Inc.

Permitted by Prairie Producing Company; the EWA schedule now lists a different operator.

Based in
Argyle, TX
P-5 status
Active (A)
P-5 last filed
Dec 10, 2025
Permits on file
57
Phone
(432) 559-9288

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArrowhead Operating Inc.
Production reportsArrowhead Operating Inc.through Apr 2026
Latest permitPrairie Producing CompanyOct 12, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Oct 12, 1983
last permit issued
Jan 26, 1984
completed
59.1K
cumulative oil, bbl
6.25K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 26, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Minerals O-3-8750Batson NewArrowhead Operating Inc.759.1K6.25KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 101 · prior 12 456(-78%)

050100150202420252026

Gas, mcf lease total

Last 12 months 6 · prior 12 2(+200%)

0123202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Green Mountain Oil & Gas CompanyJan 1994 → Oct 1995
  2. 2Drum, DeltonJun 2003 → Aug 2004
  3. 3Seventh Avenue Capital, LLCOct 2004 → Aug 2005
  4. 4Crebbs Oil CompanySep 2005 → Jun 2024
  5. 5Arrowhead Operating Inc.Jul 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
216924-99DrillPrairie Producing CompanyOct 12, 1983Oct 12, 1983—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-8750————

Formation tops

As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →

FormationMD ftSubsea
Vicksburg6,140-6,075
Jackson6,260-6,195
Yegua6,785-6,720

Perforations

Perforated and open-hole intervals.

FromToType
7,4507,480Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,55512.25960 sx
5.57,5108.75750 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 20, 1984Mar 15, 1984—
00Jul 14, 1984Mar 15, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19932043, documented in the API reference.