TEXAS · WELLS · HARDIN COUNTY · T. T. CO. FEE LEASE · API 42-199-32206 · DISTRICT 03

T. T. Co. Fee #783

Plugged

Hardin County · Sour Lake field  · Vertical

T. T. CO. Fee #783 (API 42-199-32206) is a plugged well in Hardin County, plugged May 28, 2021, last operated by Radco Operations L.P..

The RRC has issued one drilling permit, issued October 26, 1984, permitted to 1,320 ft.

It was permitted by Texaco Inc. and has since transferred to Radco Operations L.P. on the wellbore schedule.

Its lease has reported 1.72M barrels of oil and 738 mcf of gas since January 1993, last reporting volume in March 2026. The lease carries 427 wells, so these are lease totals, not this well alone.

Operator of record

Radco Operations L.P.

Permitted by Texaco Inc.; the EWA schedule now lists a different operator.

Based in
Sourlake, TX
P-5 status
Active (A)
P-5 last filed
Dec 22, 2025
Permits on file
50
Phone
(409) 287-1277

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRadco Operations L.P.
Production reportsRadco Operations, L.P.through Mar 2026
Latest permitTexaco Inc.Oct 26, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,320
total depth, ft
1
permits on file
Oct 26, 1984
last permit issued
Nov 11, 1986
completed
1.72M
cumulative oil, bbl
738
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 11, 1986
Shut in
—
Plugged
May 28, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 427 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
T. T. Co. Fee O-3-3929Sour LakeRadco Operations, L.P.4271.72M738Jan 1993 – Mar 2026

Oil, barrels lease total

Last 12 months 12,016 · prior 12 19,390(-38%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Mar 1998
  3. 3Tri-Union Development Corp.Apr 1998 → Oct 2004
  4. 4Texcal Energy (GP) LLCNov 2004 → May 2005
  5. 5Texas Petroleum Investment Co.Jun 2005 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
255890-99DrillTexaco Inc.Oct 25, 1984Oct 26, 1984Jan 10, 19851,320

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 11, 1986T. T. Co. Fee O-3-3929Sour LakeRadco Operations L.P.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
1,2121,230Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7529614.75300 S
71,3269.375410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 31, 1986Dec 1, 1986—
00Mar 14, 1985Feb 20, 1985—
00Mar 13, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000056366H-1 InjectionPlugged Jun 8, 2021800280400–1,324

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19932206, documented in the API reference.