TEXAS · WELLS · HARDIN COUNTY · BLACK STONE - DUFF GAS UNIT LEASE · API 42-199-32870 · DISTRICT 03
Black Stone - Duff Gas Unit #1
Hardin County · Village Mills Deep (WX Cons.) field · Producing · Vertical
Black Stone - Duff Gas Unit #1 (API 42-199-32870) is a well in Hardin County operated by Neches Transport Inc., completed April 26, 2004 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 2002 and 2003, permitted to 12,800 ft.
It was permitted by Sanchez Oil & Gas Corporation and has since transferred to Neches Transport Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Yegua, Wilcox, See Original G-1.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Sanchez Oil & Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Spurger, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 21, 2026
- Permits on file
- 1
- Phone
- (409) 429-5900
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Neches Transport Inc. |
| Production reports | Neches Transport Inc.through Apr 2026 |
| Latest permit | Sanchez Oil & Gas CorporationDec 31, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,800
- total depth, ft
- 3
- permits on file
- Dec 31, 2003
- last permit issued
- Apr 26, 2004
- completed
- 0
- cumulative oil, bbl
- 1.45M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 26, 2004
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Black Stone - Duff Gas Unit G-3-193840 | Village Mills Deep (WX Cons.) | Neches Transport Inc. | 1 | 0 | 1.45M | Feb 2003 – Jul 2026 |
Gas, mcf lease total
Last 12 months 5,397 · prior 12 1,913(+182%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sanchez Oil & Gas CorporationFeb 2003 → Dec 2007
- 2Unit Petroleum CompanyJan 2008 → May 2022
- 3Olipdp II, LLCJun 2022 → May 2025
- 4Neches Transport Inc.May 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540274-99 | Recompletion | Sanchez Oil & Gas Corporation | Dec 31, 2003 | Dec 31, 2003 | — | 12,800 |
| 524767-98 | Drill | Sanchez Oil & Gas Corporation | Oct 23, 2002 | Oct 18, 2002 | Nov 28, 2002 | 14,000 |
| 524767-99 | Drill | Sanchez Oil & Gas Corporation | Oct 18, 2002 | Oct 18, 2002 | — | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 26, 2004 | Black Stone - Duff Gas Unit G-3-193840 | Village Mills Deep (WX Cons.) | Neches Transport Inc. | Producing | 12,800 |
Formation tops
As filed on W-2/G-1. Subsea from 91 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,258 | 10,264 | Perforated |
| 10,925 | 10,931 | Perforated |
| 10,925 | 10,943 | Perforated |
| 10,936 | 10,943 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,308 | 14.75 | 1,740 S |
| 7.625 | 10,527 | 9.875 | 1,090 S |
| 4.5 | 12,800 | 6.5 | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 2011 | Dec 2, 2010 | — |
| 00 | Jul 26, 2004 | May 8, 2004 | — |
| 00 | May 20, 2003 | Apr 1, 2003 | — |
| 00 | May 1, 2003 | Mar 19, 2003 | Yes |
| 00 | Apr 14, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-32870 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-32870 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19932870, documented in the API reference.