WELL · 42-201-00077 · DISTRICT 3

Tomball G U 2 #22

Shut in

Harris County · Tomball (Miocene 2400) field · Not Eligible for Allowable  · Vertical

Tomball G U 2 #22 (API 42-201-00077) is a well in Harris County operated by Americo Energy Resources LLC, completed October 24, 1996 and listed as not eligible for allowable on the RRC schedule, shut in January 1, 1998.

The RRC has issued 2 drilling permits between 1984 and 1990, permitted to 5,595 ft.

It was permitted by Exxon Corp. and has since transferred to Americo Energy Resources LLC on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Americo Energy Resources LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 29, 2025
Permits on file
80
Phone
(713) 984-9700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsGaither Petroleum Corporationthrough Dec 1996
Latest permitExxon Corp.Dec 5, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,595
total depth, ft
2
permits on file
Dec 5, 1990
last permit issued
Oct 24, 1996
completed
0
cumulative oil, bbl
26.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 24, 1996
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tomball G U 2 G-3-137362Tomball (Miocene 2400)Americo Energy Resources, LLC1026.5KJan 1993 – Jul 2026
— G-3-118376——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gaither Petroleum CorporationAug 1993 → Dec 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
381971-99RecompletionExxon Corp.Dec 5, 1990Dec 5, 1990Jan 25, 19915,595
249450-99RecompletionExxon Corp.Aug 14, 1984Aug 24, 1984—5,595

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 24, 1996Tomball G U 2 G-3-137362Tomball (Miocene 2400)Americo Energy Resources LLCNot Eligible for Allowable · shut in Jan 1, 19985,595
Sep 9, 1985Tomball G U 2 G-3-118376Tomball (Miocene 1650)Exxon Corp.Not on Schedule—
Jul 25, 1983Theis Will a/C #1 -A- O-3-9231Tomball (Petrich NW.)Exxon Corp.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
1,6021,604Perforated
1,6061,610Perforated
1,7361,746Perforated
2,4422,452Perforated
5,5845,595Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62596212.25280 S
9.625962——
2.3755,336——
5.55,5918.625280 S
5.55,591——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 6, 2008Dec 3, 2007—
00May 2, 1991Mar 8, 1991Yes
00Mar 26, 1991——
00Dec 3, 1985Oct 3, 1985Yes
00Oct 15, 1985——
00Jan 12, 1984Aug 22, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20100077, documented in the API reference.