TEXAS · WELLS · HARRIS COUNTY · HILLEGEIST, E LEASE · API 42-201-00272 · DISTRICT 03

Hillegeist E #1

Shut in

Harris County · Tomball (Miocene 3150) field · Temp Abandoned  · Vertical

Hillegeist E #1 (API 42-201-00272) is a well in Harris County operated by Tortuga Operating Company, completed September 6, 1985 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.

The RRC has issued 2 drilling permits between 1979 and 1985, permitted to 5,600 ft.

No lease production has been reported under this well’s leases.

Operator of record

Tortuga Operating Company

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Aug 20, 2025
Permits on file
92
Phone
(713) 680-3600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexaco Inc.
Production reportsnone
Latest permitTortuga Operating CompanyApr 11, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
2
permits on file
Apr 11, 1985
last permit issued
Sep 6, 1985
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 6, 1985
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hillegeist, E G-3-118162Tomball (Miocene 3150)Tortuga Operating Company100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
271800-99RecompletionTortuga Operating CompanyFeb 25, 1985Apr 11, 1985—5,597
55922-99RecompletionTexaco Inc.Aug 3, 1979Aug 3, 1979Aug 21, 19795,589

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 6, 1985Hillegeist E G-3-118162Tomball (Miocene 3150)Tortuga Operating CompanyTemp Abandoned · shut in Jan 1, 19985,600
Oct 27, 1981Hilligiest E. Tr. 1 G-3-96042Tomball (Petrich NW.)Tortuga Operating CompanyNot on Schedule—
—Hillegeist E. Tr. 1 G-3-8581Tomball (Sid Moore)Texaco Inc.Not on Schedule—
—Hillegeist E. TR.1 G-3-44384Tomball (Petrich NW.)Texaco Inc.Not on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
2,8602,863Perforated
5,5265,540Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,11915506 S
10.751,119——
10.751,13114.75506 S
2.8755,400——
75,510——
75,5208.75300 S
75,5209.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 9, 1985Sep 20, 1985Yes
00Oct 2, 1985——
00Jan 12, 1984Nov 6, 1981—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20100272, documented in the API reference.