WELL · 42-201-00629 · DISTRICT 3
Theis, F. a/C 1 #7
Harris County · Vertical
Theis, F. A/C 1 #7 (API 42-201-00629) is a permitted well in Harris County filed by Exxon Corp.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1977 and 1984, permitted to 8,350 ft.
Its 2 leases have reported 179K barrels of oil and 264K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Tandem Energy Corporationthrough Apr 2026 |
| Latest permit | Exxon Corp.Mar 21, 1984 |
- 8,350
- total depth, ft
- 2
- permits on file
- Mar 21, 1984
- last permit issued
- —
- completed
- 179K
- cumulative oil, bbl
- 264K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Theis, Fritz, a/C #1 O-3-6895 | Tomball (Lewis 5930) | Tandem Energy Corporation | 4 | 179K | 264K | Jan 1993 – Jul 2026 |
| Tomball GU 9 G-3-72891 | Tomball (Jackson 4400,SE) | Tandem Energy Corporation | 1 | 0 | 0 | Jan 1993 – Nov 2004 |
Oil, barrels lease total
Last 12 months 2,435 · prior 12 2,501(-3%)
Gas, mcf lease total
Last 12 months 4,014 · prior 12 4,015(0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Jul 1996
- 2MerencoAug 1996 → Dec 1996
- 3Tandem Energy CorporationJan 1997 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 234505-99 | Recompletion | Exxon Corp. | Jan 23, 1984 | Mar 21, 1984 | — | 8,350 |
| 7614-99 | Recompletion | Exxon Corp. | Sep 6, 1977 | Sep 6, 1977 | — | 8,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-72891 | — | — | — | — |
| — | — O-3-6895 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,346 | 4,351 | Perforated |
| 5,928 | 5,934 | Perforated |
| — | 5,948 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,905 | — | — |
| 9.625 | 1,925 | 8.75 | 600 S |
| 1.5 | 4,199 | — | — |
| 1.5 | 5,240 | — | — |
| 2.875 | 6,414 | — | — |
| 2.875 | 6,430 | 8.75 | 400 S |
| 2.875 | 6,435 | 8.75 | 430 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 31, 1984 | Jun 11, 1984 | — |
| 00 | Jun 27, 1984 | Jun 11, 1984 | — |
| 00 | Jan 12, 1984 | Sep 14, 1977 | — |
| 00 | Jan 12, 1984 | Dec 16, 1963 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-00629 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-00629 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20100629, documented in the API reference.