WELL · 42-201-30827 · DISTRICT 3
Jacobs, W. S. "A" #5
Harris County · Directional
Jacobs, W. S. "A" #5 (API 42-201-30827) is a permitted well in Harris County filed by Amoco Production Company; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1978 and 1988, permitted to 8,005 ft.
Its lease has reported 40.8K barrels of oil and 8.61K mcf of gas since January 1993, last reporting in March 2000. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 29, 2015
- Permits on file
- 7,201
- Phone
- (281) 366-7061
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Wood Energy Corporationthrough Aug 1998 |
| Latest permit | Amoco Production CompanyDec 5, 1988 |
- 8,005
- total depth, ft
- 4
- permits on file
- Dec 5, 1988
- last permit issued
- —
- completed
- 40.8K
- cumulative oil, bbl
- 8.61K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jacobs, W. S. -A- O-3-4995 | Satsuma (7100 Sand) | Cedar Point Oil Company | 2 | 40.8K | 8.61K | Jan 1993 – Mar 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Eastern Oil CorporationJan 1993 → Jul 1995
- 2D & G Operating Company, Inc.Aug 1995 → Feb 1996
- 3Wood Energy CorporationMar 1996 → Aug 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 352645-99 | Recompletion | Amoco Production Company | Oct 25, 1988 | Dec 5, 1988 | — | 8,000 |
| 77609-99 | Recompletion | Amoco Production Company | Mar 26, 1980 | Mar 26, 1980 | — | 8,005 |
| 45839-99 | Recompletion | Amoco Production Company | Feb 28, 1979 | Feb 28, 1979 | Feb 27, 1979 | 7,600 |
| 27567-99 | Drill | Amoco Production Company | Feb 21, 1978 | Feb 21, 1978 | May 28, 1978 | 7,806 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-4995 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,092 | 7,100 | Perforated |
| 7,632 | 7,642 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,261 | 14.75 | 900 S |
| 2.875 | 6,975 | — | — |
| 2.875 | 7,524 | — | — |
| 7 | 8,005 | 9.875 | 1,721 S |
| — | 8,005 | 9.875 | 1,721 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | May 14, 1980 | — |
| 00 | Jan 12, 1984 | Aug 17, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-30827 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-30827 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20130827, documented in the API reference.