WELL · 42-201-31430 · DISTRICT 3
1ST Natl. Bank & Trust Co. of WY #1
Harris County · Wildcat field · Vertical
1st Natl. Bank & Trust CO. Of WY #1 (API 42-201-31430) is a plugged well in Harris County, plugged January 14, 1987, last operated by Tenneco Oil Company-Tgcd.
The RRC has issued one drilling permit, issued August 6, 1982, permitted to 14,000 ft.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 18, 1988
- Permits on file
- 73
- Phone
- (713) 583-3010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tenneco Oil Company-Tgcd |
| Production reports | none |
| Latest permit | Tenneco Oil Company-TgcdAug 6, 1982 |
- 14,000
- total depth, ft
- 1
- permits on file
- Aug 6, 1982
- last permit issued
- Apr 27, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 27, 1983
- Shut in
- —
- Plugged
- Jan 14, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 168419-99 | Drill | Tenneco Oil Company-Tgcd | Aug 6, 1982 | Aug 6, 1982 | — | 14,000 |
Formation tops
As filed on W-2/G-1. Subsea from 142 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| — | 10,579 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 60 | 30 | 210 S |
| 11.75 | 2,491 | 14.75 | 1,000 S |
| 8.625 | 8,389 | 10.625 | 495 S |
| 5.5 | 12,790 | 7.625 | 745 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1985 | Mar 8, 1985 | — |
| 00 | Jun 4, 1985 | — | — |
| 00 | May 25, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-31430 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-31430 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20131430, documented in the API reference.