WELL · 42-201-32122 · DISTRICT 3
Nash Hannah #5
Harris County · Ulrich (Yegua Consol) field · Vertical
Nash Hannah #5 (API 42-201-32122) is a plugged well in Harris County, plugged September 19, 2023, last operated by Magnum Producing LP.
The RRC has issued 4 drilling permits (amended 3 times) between 1988 and 1998, permitted to 12,000 ft.
It was permitted by Smith Production Inc. and has since transferred to Magnum Producing LP on the wellbore schedule.
Completion filings report one formation top, including Yegua.
Its 5 leases have reported 56.9K barrels of oil and 2.62M mcf of gas since January 1993, last reporting in October 2023. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 26, 2026
- Permits on file
- 312
- Phone
- (361) 882-3858
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | Magnum Producing, LPthrough Sep 2023 |
| Latest permit | Smith Production Inc.Sep 4, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 7
- permits on file
- Sep 4, 1998
- last permit issued
- Sep 9, 1998
- completed
- 56.9K
- cumulative oil, bbl
- 2.62M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 9, 1998
- Shut in
- —
- Plugged
- Sep 19, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nash, Hannah O-3-24644 | Ulrich (Yegua Consol) | Magnum Producing, LP | 1 | 56.9K | 407K | Jul 2004 – Oct 2023 |
| Nash, Hannah G-3-127418 | Ulrich (Yegua 1D) | Magnum Producing, LP | 1 | 0 | 0 | Jan 1993 – Sep 2023 |
| Nash, Hannah G-3-170228 | Ulrich (Yegua Consol) | Magnum Producing, LP | 1 | 0 | 799K | Sep 1998 – Aug 2004 |
| Nash, Hannah G-3-146807 | Ulrich (Yegua 1-E) | Smith Production Inc. | 1 | 0 | 1.41M | Jun 1993 – Dec 1998 |
| Nash, Hannah G-3-132101 | Ulrich (Yegua 2A) | Mobil Producing TX. & N.M. Inc. | 1 | 0 | 6.43K | Jan 1993 – Nov 1993 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Dec 1997
- 2Smith Production Inc.Jan 1998 → Sep 2002
- 3Westport Oil and Gas Company, LPOct 2002 → Nov 2002
- 4Magnum Producing & Operating Co.Jan 2003 → Jan 2004
- 5Magnum Producing, LPFeb 2004 → Sep 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 477984-99 | Recompletion | Smith Production Inc. | Jul 15, 1998 | Sep 4, 1998 | Sep 8, 1998 | 11,330 |
| 410127-97 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 6, 1993 | Mar 24, 1993 | Jun 2, 1993 | 11,330 |
| 410127-98 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jun 15, 1993 | Mar 24, 1993 | — | 11,330 |
| 410127-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Mar 23, 1993 | Mar 24, 1993 | — | 11,330 |
| 362356-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Aug 3, 1989 | Aug 3, 1989 | — | 12,000 |
| 341297-98 | Drill | Mobil Producing TX. & N.M. Inc. | Jun 2, 1988 | Jan 13, 1988 | — | 12,000 |
| 341297-99 | Drill | Mobil Producing TX. & N.M. Inc. | Jan 12, 1988 | Jan 13, 1988 | — | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 9, 1998 | Nash Hannah G-3-170228 | Ulrich (Yegua Consol) | Magnum Producing LP | Plugged | — |
| Jun 30, 1993 | Nash Hannah G-3-146807 | Ulrich (Yegua 1-E) | Smith Production Inc. | Plugged | — |
| Aug 14, 1989 | Nash Hannah G-3-132101 | Ulrich (Yegua 2A) | Mobil Producing TX. & N.M. Inc. | Plugged | — |
| May 20, 1988 | Nash Hannah G-3-127418 | Ulrich (Yegua 1D) | Magnum Producing LP | Plugged | — |
| — | Nash Hannah O-3-24644 | Ulrich (Yegua Consol) | Magnum Producing LP | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 34 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 595 | 10,583 | Perforated |
| 10,539 | 10,551 | Perforated |
| 10,663 | 10,684 | Perforated |
| 10,772 | 10,786 | Perforated |
| 11,104 | 11,129 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,250 | 17.5 | 3,720 S |
| 9.625 | 8,858 | 12.25 | 530 S |
| 7 | 11,094 | — | 450 S |
| 20 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 26, 2005 | — | — |
| 00 | Oct 26, 1998 | Sep 17, 1998 | Yes |
| 00 | Oct 9, 1998 | — | — |
| 00 | Apr 21, 1994 | Aug 19, 1993 | Yes |
| 00 | Oct 25, 1993 | — | — |
| 00 | Oct 30, 1989 | Oct 12, 1989 | Yes |
| 00 | Oct 20, 1989 | — | — |
| 00 | Jun 28, 1988 | Jun 6, 1988 | Yes |
| 00 | Jun 14, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32122 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32122 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132122, documented in the API reference.