WELL · 42-201-32316 · DISTRICT 3

Stateland Oil Company #57

Y

Harris County · Goose Creek field · Producing  · Directional

Stateland Oil Company #57 (API 42-201-32316) is a well in Harris County operated by Gaither Petroleum Corporation, completed January 3, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued April 15, 1993, permitted to 5,000 ft.

It was permitted by Pennzoil Petroleum Company and has since transferred to Gaither Petroleum Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including C-5 Sand, C-7 Sand, C-9 Sand.

Its lease has reported 939K barrels of oil and 35.4K mcf of gas since January 1993, last reporting in July 2026. The lease carries 11 wells, so these are lease totals, not this well alone.

Operator of record

Gaither Petroleum Corporation

Permitted by Pennzoil Petroleum Company; the EWA schedule now lists a different operator.

Based in
Katy, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
117
Phone
(281) 994-5400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGaither Petroleum Corporation
Production reportsGaither Petroleum Corporationthrough Apr 2026
Latest permitPennzoil Petroleum CompanyApr 15, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
2
permits on file
Apr 15, 1993
last permit issued
Jan 3, 1994
completed
939K
cumulative oil, bbl
35.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 3, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stateland Oil Company O-3-1777Goose CreekGaither Petroleum Corporation11939K35.4KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 13,717 · prior 12 13,763(0%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
  2. 2Pennzoil Exploration & Prod. Co.Feb 1995 → Feb 1999
  3. 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Nov 1999
  4. 4Gaither Petroleum CorporationDec 1999 → Apr 2026
  5. 5LA-Tex Operating CompanyApr 2002 → Apr 2011
  6. 6Hollimon Oil CorporationMay 2011 → Apr 2015
  7. 7Siempre Energy Operating, LLCMay 2015 → Mar 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
410776-98DrillPennzoil Petroleum CompanyDec 10, 1993Apr 15, 1993Jul 24, 19935,000
410776-99DrillPennzoil Petroleum CompanyApr 15, 1993Apr 15, 1993—5,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-1777————

Formation tops

As filed on W-2/G-1. Subsea from 32 ft elevation.Download CSV →

FormationMD ftSubsea
C-5 Sand2,672-2,640
C-7 Sand2,764-2,732
C-9 Sand2,931-2,899

Perforations

Perforated and open-hole intervals.

FromToType
2,9312,941Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,23412.251,600 S
74,1568.75520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 3, 1994Jan 14, 1994Yes
00Jan 25, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132316, documented in the API reference.