WELL · 42-201-32724 · DISTRICT 3
Hcwd-58 #1
Harris County · Rankin (Cook Mtn. IV) field · Vertical
Hcwd-58 #1 (API 42-201-32724) is a plugged well in Harris County, plugged September 18, 2026, last operated by Proline Energy Resources Inc.
The RRC has issued one drilling permit, issued May 20, 2005, permitted to 10,000 ft.
It was permitted by Brammer Engineering, Inc. and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report one formation top, including Cook Mountain.
Operator of record
Permitted by Brammer Engineering, Inc.; the EWA schedule now lists a different operator.
- Based in
- Sugar Land, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Phone
- (832) 886-4420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | Proline Energy Resources Incthrough Jul 2024 |
| Latest permit | Brammer Engineering, Inc.May 20, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- May 20, 2005
- last permit issued
- Aug 5, 2005
- completed
- 0
- cumulative oil, bbl
- 1.23M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 5, 2005
- Shut in
- —
- Plugged
- Sep 18, 2026
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hcwd-58 G-3-210921 | Rankin (Cook Mtn. IV) | Proline Energy Resources Inc | 1 | 0 | 1.23M | Aug 2005 – Jul 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 110(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brammer Engineering, Inc.Aug 2005 → Nov 2011
- 2Faulconer, Vernon E., Inc.Dec 2011 → Apr 2018
- 3Proline Energy Resources IncMay 2018 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600942-99 | Drill | Brammer Engineering, Inc. | May 19, 2005 | May 20, 2005 | Jun 4, 2005 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 5, 2005 | Hcwd-58 G-3-210921 | Rankin (Cook Mtn. IV) | Proline Energy Resources Inc | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cook Mountain | 8,780 | -8,715 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,484 | 9,508 | Perforated |
| 9,525 | 9,535 | Perforated |
| 9,604 | 9,640 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,525 | 17.5 | 2,710 S |
| 9.625 | 8,905 | 12.25 | 1,540 S |
| 5.5 | 9,900 | 8.5 | 465 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 2005 | Sep 9, 2005 | Yes |
| 00 | Sep 23, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32724 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32724 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132724, documented in the API reference.