TEXAS · WELLS · HARRIS COUNTY · WEBSTER FIELD UNIT LEASE · API 42-201-32896 · DISTRICT 03
Webster Field Unit #6000
Harris County · Webster field · Shut In · Vertical
Webster Field Unit #6000 (API 42-201-32896) is a well in Harris County operated by P.O.&G. Operating LLC, completed August 14, 2014 and listed as shut in on the RRC schedule, shut in August 1, 2014.
The RRC has issued one drilling permit (amended once), issued December 5, 2013, permitted to 5,170 ft.
It was permitted by Denbury Onshore, LLC and has since transferred to P.O.&G. Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Evangeline, Miocene (undifferentiated), Anahuac.
Its lease has reported 26.2M barrels of oil and 262M mcf of gas since January 1993, last reporting volume in March 2026. The lease carries 385 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Denbury Onshore, LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 10, 2025
- Permits on file
- 95
- Phone
- (713) 244-0779
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | P.o.&g. Operating LLC |
| Production reports | P.o.&g. Operating, LLCthrough Mar 2026 |
| Latest permit | Denbury Onshore, LLCDec 5, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,170
- total depth, ft
- 2
- permits on file
- Dec 5, 2013
- last permit issued
- Aug 14, 2014
- completed
- 26.2M
- cumulative oil, bbl
- 262M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 14, 2014
- Shut in
- Aug 1, 2014
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 385 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Webster Field Unit O-3-10496 | Webster | P.o.&g. Operating, LLC | 385 | 26.2M | 262M | Jan 1993 – Mar 2026 |
Oil, barrels lease total
Last 12 months 455,184 · prior 12 486,116(-6%)
Gas, mcf lease total
Last 12 months 280,051 · prior 12 279,737(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Nov 2012
- 3Denbury Onshore, LLCDec 2012 → Jul 2024
- 4P.o.&g. Operating, LLCAug 2024 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 774328-98 | Drill | Denbury Onshore, LLC | Feb 20, 2014 | Dec 5, 2013 | Aug 1, 2014 | 5,143 |
| 774328-99 | Drill | Denbury Onshore, LLC | Nov 21, 2013 | Dec 5, 2013 | Aug 1, 2014 | 5,143 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 14, 2014 | Webster Field Unit O-3-10496 | Webster | P.o.&g. Operating LLC | Shut In · shut in Aug 1, 2014 | 5,170 |
Formation tops
As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Evangeline | 2,957 | -2,932 |
| Miocene (undifferentiated)MIOCENE / FLEMING | 4,531 | -4,506 |
| AnahuacANAHUAC SHALE | 5,103 | -5,078 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,625 | 17.5 | 1,420 S |
| 9.625 | 5,160 | 12.25 | 1,051 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 17, 2015 | Nov 5, 2014 | Yes |
Well logs
2 logs loaded from the RRC's log index, 2 of them with a digital LAS file, the latest received Jul 20, 2017. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| OtherSpans Evangeline, Miocene (undifferentiated), Anahuac | LAS + TIFF | 1,623 to 5,171 | Jul 20, 2017 | 4.74 + 8.90 |
| OtherSpans Evangeline, Miocene (undifferentiated), Anahuac | LAS + TIFF | 1,623 to 5,171 | Jun 5, 2017 | 4.74 + 8.90 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32896 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32896 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000117749 | H-1 Injection | Not activated | 30,000 | 1,475 | 2,950–5,170 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132896, documented in the API reference.