TEXAS · WELLS · HARRISON COUNTY · GAIL SAND UNIT LEASE · API 42-203-01766 · DISTRICT 06

Gail Sand Unit #H2W

WaterPlugged

Harrison County · Waskom (Gail Sand) field  · Vertical

Gail Sand Unit #H2W (API 42-203-01766) is a plugged well in Harrison County, plugged May 17, 1991, last operated by Xto Energy Inc..

The RRC has issued one drilling permit, issued July 24, 1979, permitted to 6,330 ft.

It was permitted by Lake Ronel Oil Company and has since transferred to Xto Energy Inc. on the wellbore schedule.

Its lease has reported 72.7K barrels of oil and 144 mcf of gas since January 1993, last reporting in April 2010. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Lake Ronel Oil Company; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Jan 2010
Latest permitLake Ronel Oil CompanyJul 24, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,330
total depth, ft
1
permits on file
Jul 24, 1979
last permit issued
Jul 12, 1979
completed
72.7K
cumulative oil, bbl
144
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 12, 1979
Shut in
—
Plugged
May 17, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gail Sand Unit O-6-10144Waskom (Gail Sand)XTO Energy Inc.1072.7K144Jan 1993 – Apr 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tyler Oil & Gas Inc.Jan 1993 → Sep 2004
  2. 2Tyler Oil & Gas, Ltd.Oct 2004 → Oct 2004
  3. 3XTO Energy Inc.Nov 2004 → Jan 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
53603-99OtherLake Ronel Oil CompanyJul 24, 1979Jul 24, 1979—6,330

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 12, 1979Gail Sand Unit O-6-10144Waskom (Gail Sand)XTO Energy Inc.Plugged—
Jun 15, 1972Abney C. M. O-6-5600Waskom (Gail Sand)Lake Ronel Oil CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
6,1766,191Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,01515400 S
5.56,3308.75350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 1991——
00Oct 12, 1988Sep 1, 1988—
00Oct 11, 1988Sep 1, 1988—
00Jan 12, 1984Jun 26, 1972—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

135
bbl, last 12 reported months
148K
bbl, all reported
Mar 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000040708UIC PermitPlugged Jun 5, 19916002,0006,176–6,191

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 135

0501001991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20301766, documented in the API reference.