WELL · 42-203-01830 · DISTRICT 6

America Woodley Unit 2 #1

Plugged

Harrison County · Woodley (Pettit) field  · Vertical

America Woodley Unit 2 #1 (API 42-203-01830) is a plugged well in Harrison County, plugged November 24, 2016, last operated by Triple J Investments Inc.

The RRC has issued one drilling permit, issued January 22, 1985, permitted to 6,505 ft.

It was permitted by Faulconer, Vernon E., Inc. and has since transferred to Triple J Investments Inc on the wellbore schedule.

Completion filings report 3 formation tops, including Pettit, Paige, Travis Peak.

Its 2 leases have reported 1.64K barrels of oil and 26.2K mcf of gas since January 1993, last reporting in January 2017. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Triple J Investments Inc

Permitted by Faulconer, Vernon E., Inc.; the EWA schedule now lists a different operator.

Based in
Longview, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 26, 2022
Permits on file
88
Phone
(903) 758-6178

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTriple J Investments Inc
Production reportsTriple J Investments Incthrough Aug 2015
Latest permitFaulconer, Vernon E., Inc.Jan 22, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,505
total depth, ft
1
permits on file
Jan 22, 1985
last permit issued
Oct 1, 2008
completed
1.64K
cumulative oil, bbl
26.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2017

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 1, 2008
Shut in
—
Plugged
Nov 24, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
America Woodley Unit 2 O-6-14836Woodley (Pettit)Triple J Investments Inc11.64K26.2KOct 2008 – Jan 2017
America Woodley Unit 2 G-6-115071Woodley (Pettit)Triple J Investments Inc100Jan 1993 – Sep 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Triple J Investments IncOct 2008 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
264770-99RecompletionFaulconer, Vernon E., Inc.Oct 2, 1984Jan 22, 1985—6,505

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-115071————
—— O-6-14836————

Formation tops

As filed on W-2/G-1. Subsea from 299 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit6,146-5,847
Paige6,172-5,873
Travis Peak6,229-5,930
Travis Peak6,287-5,988

Perforations

Perforated and open-hole intervals.

FromToType
6,0036,014Perforated
6,3046,312Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62570012.25250 S
9.625700—250 S
5.56,5028.75700 S
5.56,502——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 13, 2009Nov 5, 2008—
00Dec 9, 2008——
00Mar 8, 1985Dec 6, 1984—
00Mar 5, 1985Aug 1, 1984—
00Jan 12, 1984Jan 28, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20301830, documented in the API reference.