TEXAS · WELLS · HARRISON COUNTY · ROSBOROUGH GAS UNIT B LEASE · API 42-203-30773 · DISTRICT 06

Rosborough Gas Unit B #1

Shut in

Harrison County · Blocker (Cotton Valley) field · Producing  · Vertical

Rosborough Gas Unit B #1 (API 42-203-30773) is a well in Harrison County operated by Mmgl East Texas Iii LLC, completed November 15, 1980 and listed as producing on the RRC schedule, shut in February 1, 2026.

The RRC has issued one drilling permit, issued September 16, 1980, permitted to 10,200 ft.

It was permitted by Amoco Production Company and has since transferred to Mmgl East Texas Iii LLC on the wellbore schedule.

Its lease has reported 4.33K barrels of oil and 975K mcf of gas since January 1993, last reporting volume in January 2026.

Operator of record

Mmgl East Texas III LLC

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 3, 2025
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl East Texas III LLC
Production reportsMmgl East Texas III, LLCthrough Jan 2026
Latest permitAmoco Production CompanySep 16, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
1
permits on file
Sep 16, 1980
last permit issued
Nov 15, 1980
completed
4.33K
cumulative oil, bbl
975K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 15, 1980
Shut in
Feb 1, 2026
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rosborough Gas Unit B G-6-90844Blocker (Cotton Valley)Mmgl East Texas III, LLC14.33K975KJan 1993 – Jan 2026

Gas, mcf lease total

Last 12 months 1,105 · prior 12 6,678(-83%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Feb 2022
  3. 3BPX Operating CompanyMar 2022 → Oct 2024
  4. 4Mmgl East Texas III, LLCNov 2024 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
92779-99DrillAmoco Production CompanySep 16, 1980Sep 16, 1980Sep 21, 198010,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 15, 1980Rosborough Gas Unit B G-6-90844Blocker (Cotton Valley)Mmgl East Texas III LLCProducing · shut in Feb 1, 202610,200

Perforations

Perforated and open-hole intervals.

FromToType
8,6718,678Perforated
8,6948,712Perforated
8,7738,785Perforated
9,79010,054Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
167526290 S
9.6251,80012.25760 S
2.8759,700——
5.510,2008.752,105 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 18, 1991Feb 27, 1991—
00Jan 12, 1984Dec 5, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20330773, documented in the API reference.