WELL · 42-203-30970 · DISTRICT 6

Blocker Ware #4

N

Harrison County · Blocker (Travis Peak) field  · Vertical

Blocker Ware #4 (API 42-203-30970) is a well in Harrison County operated by Gmx Resources Inc., completed January 26, 2000.

The RRC has issued 3 drilling permits between 1982 and 2000, permitted to 10,150 ft.

Completion filings report 6 formation tops, including Pecan Gap, Blossom, Massive Anhydrite (marker), James Lime.

No lease production has been reported under this well’s leases.

Operator of record

GMX Resources Inc.

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Dec 21, 2013
Permits on file
318
Phone
(405) 600-0711

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGMX Resources Inc.
Production reportsEnpower Resources Inc.through Mar 2020
Latest permitGMX Resources Inc.Oct 9, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,150
total depth, ft
3
permits on file
Oct 9, 2000
last permit issued
Jan 26, 2000
completed
0
cumulative oil, bbl
560K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 26, 2000
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blocker Ware (Sun) G-6-103479Carthage, North (Cotton Valley)Enpower Resources Inc.100Jan 1993 – Jul 2026
Blocker-Ware G-6-179589Bethany (Pettit)Enpower Resources Inc.10544KMay 2000 – Jul 2026
Blocker Ware G-6-176630Blocker (Travis Peak)GMX Resources Inc.1016KJan 2000 – Nov 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1GMX Resources Inc.Feb 2000 → Aug 2012
  2. 2East Texas Exploration, LLCSep 2012 → Jul 2019
  3. 3Enpower Resources Inc.Oct 2019 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
500336-99RecompletionGMX Resources Inc.Oct 3, 2000Oct 9, 2000May 11, 200010,150
492954-99RecompletionGMX Resources Inc.Mar 10, 2000Mar 10, 2000Jan 14, 199910,150
162956-99DrillSun Expl. & Prod. Co.-LafayetteJun 7, 1982Jun 7, 1982Jun 19, 198210,150

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-103479————
—— G-6-176630————
—— G-6-179589————

Formation tops

As filed on W-2/G-1. Subsea from 339 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap2,164-1,825
Blossom2,316-1,977
Massive Anhydrite (marker)MASSIVE ANHYDRITE5,353-5,014
James LimeJAMES5,846-5,507
Travis Peak6,446-6,107
"B" Lime8,620-8,281
Massive Anhydrite (marker)MASSIVE ANHYDRITE——

Perforations

Perforated and open-hole intervals.

FromToType
6,3536,391Perforated
6,6096,695Perforated
9,9379,948Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
166024—
1660——
9.6251,65012.25820 S
2.8759,890——
5.510,1507.8751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 5, 2001Sep 25, 2000Yes
00Nov 27, 2000——
00Jun 26, 2000Mar 6, 2000—
00May 4, 2000——
00Jan 12, 1984Jan 14, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20330970, documented in the API reference.