TEXAS · WELLS · HARRISON COUNTY · API 42-203-31450 · DISTRICT 06

Jonesville A #16

Plugged

Harrison County · Waskom (Bell Zone) field  · Vertical

Jonesville A #16 (API 42-203-31450) is a plugged well in Harrison County, plugged June 5, 2014, last operated by Compass Energy Operating LLC.

The RRC has issued 2 drilling permits between 1986 and 1996, permitted to 6,700 ft.

It was permitted by Winchester Production Company and has since transferred to Compass Energy Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Massive Anhydrite (marker), Pettit, Travis Peak.

Operator of record

Compass Energy Operating LLC

Permitted by Winchester Production Company; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active (A)
P-5 last filed
Jan 7, 2026
Permits on file
27
Phone
(918) 376-0550

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWinchester Production Company
Production reportsExco Operating Company, LPthrough Mar 2012
Latest permitWinchester Production CompanyApr 15, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
2
permits on file
Apr 15, 1996
last permit issued
Mar 14, 1996
completed
0
cumulative oil, bbl
1.15M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 14, 1996
Shut in
—
Plugged
Jun 5, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jonesville "A" G-6-158540Waskom (Bell Zone)Exco/Hgi JV Assets, LLC101.11MMar 1996 – Jun 2014
Jonesville G-6-121906Waskom (Travis Peak 6150)Winchester Production Company1034.7KJan 1993 – Jul 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Winchester Production CompanyJan 1993 → Apr 2007
  2. 2Winchester Production Co., Ltd.May 2007 → Jun 2008
  3. 3Exco Production Company, LPJul 2008 → Dec 2009
  4. 4Exco Operating Company, LPJan 2010 → Mar 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
446883-99RecompletionWinchester Production CompanyApr 11, 1996Apr 15, 1996Feb 26, 19966,500
303537-99DrillWinchester Production CompanySep 5, 1985Jun 23, 1986—6,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 14, 1996Jonesville A G-6-158540Waskom (Bell Zone)Compass Energy Operating LLCPlugged—
Aug 4, 1986Jonesville G-6-121906Waskom (Travis Peak 6150)Winchester Production CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 279 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,468-4,189
Pettit5,515-5,236
Pettit5,575-5,296
Travis Peak5,840-5,561

Perforations

Perforated and open-hole intervals.

FromToType
5,8465,949Perforated
6,2216,231Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00012.25350 S
4.56,6307.875910 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 1996Apr 16, 1996Yes
00Jun 28, 1996——
00Sep 3, 1986Aug 13, 1986Yes
00Aug 29, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20331450, documented in the API reference.