TEXAS · WELLS · HARRISON COUNTY · API 42-203-31550 · DISTRICT 06
Blow Joe #2
Harrison County · Waskom (McLofflin 6270) field · Vertical
Blow Joe #2 (API 42-203-31550) is a plugged well in Harrison County, plugged August 17, 1994, last operated by Winchester Production Company.
The RRC has issued 4 drilling permits between 1985 and 1990, permitted to 6,800 ft.
Completion filings report 3 formation tops, including Massive Anhydrite (marker), Pettit, Travis Peak.
Operator of record
- Based in
- Shreveport, LA
- P-5 status
- Inactive (I)
- P-5 last filed
- May 9, 2006
- Permits on file
- 528
- Phone
- (318) 683-1124
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Winchester Production Company |
| Production reports | none |
| Latest permit | Winchester Production CompanyJul 5, 1990 |
- 6,800
- total depth, ft
- 4
- permits on file
- Jul 5, 1990
- last permit issued
- Jun 28, 1990
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 28, 1990
- Shut in
- —
- Plugged
- Aug 17, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-6-12514 | — | — | 0 | 0 | 0 | — |
| Blow, Joe O-6-12734 | Waskom (McLofflin 6270) | Winchester Production Company | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 375063-99 | Recompletion | Winchester Production Company | Jul 2, 1990 | Jul 5, 1990 | — | 6,400 |
| 349519-99 | Recompletion | Winchester Production Company | Jul 29, 1988 | Aug 2, 1988 | — | 6,700 |
| 324286-99 | Drill | Winchester Production Company | Dec 12, 1986 | Dec 15, 1986 | Dec 2, 1987 | 6,700 |
| 284856-99 | Drill | Rustex Exploration, Inc. | Aug 28, 1985 | Sep 16, 1985 | — | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 28, 1990 | Blow Joe O-6-12734 | Waskom (McLofflin 6270) | Winchester Production Company | Plugged | — |
| Jan 4, 1988 | Blow Joe O-6-12514 | Bethany (Travis Peak 6305) | Winchester Production Company | Plugged | — |
| Jan 4, 1988 | Blow Joe G-6-126412 | Bethany (Travis Peak 6305) | Winchester Production Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 320 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 4,880 | -4,560 |
| Pettit | 5,900 | -5,580 |
| Travis Peak | 6,240 | -5,920 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,239 | 6,249 | Perforated |
| 6,540 | 6,546 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 569 | 11 | 220 S |
| 5 | 6,636 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 27, 1990 | Jul 12, 1990 | Yes |
| 00 | Sep 19, 1990 | — | — |
| 00 | May 8, 1989 | Apr 3, 1989 | — |
| 00 | Apr 21, 1989 | — | — |
| 00 | Mar 11, 1988 | Feb 4, 1988 | Yes |
| 00 | Mar 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-31550 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-31550 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20331550, documented in the API reference.