TEXAS · WELLS · HARRISON COUNTY · RUDD LEASE · API 42-203-31580 · DISTRICT 06

Rudd #33

Plugged

Harrison County · Waskom (Blossom) field  · Vertical

Rudd #33 (API 42-203-31580) is a plugged well in Harrison County, plugged November 17, 2011, last operated by Exco Operating Company LP.

The RRC has issued one drilling permit (amended once), issued February 19, 1987, permitted to 2,700 ft.

It was permitted by Winchester Production Company and has since transferred to Exco Operating Company LP on the wellbore schedule.

Completion filings report 2 formation tops, including Nacatoch, Blossom.

Operator of record

Exco Operating Company LP

Permitted by Winchester Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Aug 22, 2025
Permits on file
515
Phone
(214) 368-2084

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco Operating Company LP
Production reportsnone
Latest permitWinchester Production CompanyFeb 19, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,700
total depth, ft
2
permits on file
Feb 19, 1987
last permit issued
Sep 16, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 16, 1987
Shut in
—
Plugged
Nov 17, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rudd G-6-125426Waskom (Blossom)Exco Operating Company, LP100Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
326661-98DrillWinchester Production CompanyApr 1, 1987Feb 19, 1987—2,700
326661-99DrillWinchester Production CompanyFeb 17, 1987Feb 19, 1987—2,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 16, 1987Rudd G-6-125426Waskom (Blossom)Exco Operating Company LPPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 263 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch944-681
Blossom1,880-1,617

Perforations

Perforated and open-hole intervals.

FromToType
1,9101,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520712.25145 S
4.51,8465.565 S
5.52,0757.875434 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 30, 2004Jan 12, 2004—
00Nov 6, 1987Oct 2, 1987—
00Oct 30, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
4.27M
bbl, all reported
Nov 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000064641W-14 DisposalPlugged Dec 2, 20116,0007501,910–1,920

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20331580, documented in the API reference.