TEXAS · WELLS · HARRISON COUNTY · G-6-126301 LEASE · API 42-203-31652 · DISTRICT 06

Garrett E #2

Plugged

Harrison County · WDB (Travis Peak) field  · Vertical

Garrett E #2 (API 42-203-31652) is a plugged well in Harrison County, plugged March 10, 1992, last operated by Marathon Oil Company.

The RRC has issued one drilling permit, issued September 22, 1987, permitted to 7,000 ft.

It was permitted by Txo Production Corp. and has since transferred to Marathon Oil Company on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, Rodessa, James Lime, Pettit.

Operator of record

Marathon Oil Company

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2025
Permits on file
3,707
Phone
(281) 293-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil Company
Production reportsnone
Latest permitTXO Production Corp.Sep 22, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Sep 22, 1987
last permit issued
Dec 10, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 10, 1987
Shut in
—
Plugged
Mar 10, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-6-126301——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
336341-99DrillTXO Production Corp.Sep 22, 1987Sep 22, 1987—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 10, 1987Garrett E G-6-126301WDB (Travis Peak)Marathon Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 348 ft elevation.Download CSV →

FormationMD ftSubsea
BMA5,120-4,772
Rodessa5,190-4,842
James Lime5,608-5,260
Pettit5,894-5,546
Travis Peak6,232-5,884

Perforations

Perforated and open-hole intervals.

FromToType
6,2486,255Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1414——
8.62555911195 S
2.8756,5707.875325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 1988Jun 24, 1988Yes
00Feb 17, 1988Jan 6, 1988Yes
00Feb 12, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20331652, documented in the API reference.