WELL · 42-203-31693 · DISTRICT 6
Whelan #1
Harrison County · Waskom (Travis Peak 5) field · Vertical
Whelan #1 (API 42-203-31693) is a plugged well in Harrison County, plugged April 22, 1992, last operated by Winchester Production Company.
The RRC has issued 2 drilling permits between 1988 and 1990, permitted to 6,700 ft.
Completion filings report 3 formation tops, including Massive Anhydrite (marker), Pettit, Travis Peak.
Operator of record
- Based in
- Shreveport, LA
- P-5 status
- Inactive (I)
- P-5 last filed
- May 9, 2006
- Permits on file
- 528
- Phone
- (318) 683-1124
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Winchester Production Company |
| Production reports | none |
| Latest permit | Winchester Production CompanyFeb 15, 1990 |
- 6,700
- total depth, ft
- 2
- permits on file
- Feb 15, 1990
- last permit issued
- Dec 30, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 30, 1989
- Shut in
- —
- Plugged
- Apr 22, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 369920-99 | Recompletion | Winchester Production Company | Feb 15, 1990 | Feb 15, 1990 | — | 6,700 |
| 343086-99 | Drill | Winchester Production Company | Feb 24, 1988 | Feb 26, 1988 | Jun 2, 1988 | 6,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-133670 | — | — | — | — |
| — | — O-6-12403 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 233 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 4,418 | -4,185 |
| Pettit | 5,490 | -5,257 |
| Travis Peak | 5,815 | -5,582 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,836 | 5,846 | Perforated |
| 6,055 | 6,060 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 268 | 11 | 105 S |
| 5 | 6,412 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 21, 1990 | Feb 27, 1990 | Yes |
| 00 | Mar 15, 1990 | — | — |
| 00 | Aug 26, 1988 | Jul 19, 1988 | Yes |
| 00 | Aug 12, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-31693 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-31693 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20331693, documented in the API reference.