TEXAS · WELLS · HARRISON COUNTY · RUDD LEASE · API 42-203-31813 · DISTRICT 06

Rudd #8

Plugged

Harrison County · Waskom (Travis Peak 7) field  · Vertical

Rudd #8 (API 42-203-31813) is a plugged well in Harrison County, plugged November 8, 2011, last operated by Exco Operating Company LP.

The RRC has issued one drilling permit (amended once), issued August 16, 1989, permitted to 6,700 ft.

It was permitted by Winchester Production Company and has since transferred to Exco Operating Company LP on the wellbore schedule.

Completion filings report 3 formation tops, including Massive Anhydrite (marker), Pettit, Travis Peak.

Its lease has reported 598 barrels of oil and 648K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Exco Operating Company LP

Permitted by Winchester Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Aug 22, 2025
Permits on file
515
Phone
(214) 368-2084

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco Operating Company LP
Production reportsExco Operating Company, LPthrough Mar 2010
Latest permitWinchester Production CompanyAug 16, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
2
permits on file
Aug 16, 1989
last permit issued
Jan 29, 1991
completed
598
cumulative oil, bbl
648K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 29, 1991
Shut in
—
Plugged
Nov 8, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rudd G-6-137416Waskom (Travis Peak 7)Exco Operating Company, LP1598648KJan 1993 – Mar 2010

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Winchester Production CompanyJan 1993 → Apr 2007
  2. 2Winchester Production Co., Ltd.May 2007 → Jun 2008
  3. 3Exco Production Company, LPJul 2008 → Dec 2009
  4. 4Exco Operating Company, LPJan 2010 → Mar 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
362726-98DrillWinchester Production CompanyOct 15, 1990Aug 16, 1989Dec 13, 19906,700
362726-99DrillWinchester Production CompanyAug 14, 1989Aug 16, 1989—6,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 29, 1991Rudd G-6-137416Waskom (Travis Peak 7)Exco Operating Company LPPlugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,765
Pettit5,492
Travis Peak5,830

Perforations

Perforated and open-hole intervals.

FromToType
6,1936,232Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529411110 S
4.56,4457.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 19, 1991Feb 8, 1991Yes
00Mar 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20331813, documented in the API reference.