TEXAS · WELLS · HARRISON COUNTY · MASSINGALE, JAMES LEASE · API 42-203-32013 · DISTRICT 06

Massingale James #1

Plugged

Harrison County · Waskom (Cotton Valley) field  · Vertical

Massingale James #1 (API 42-203-32013) is a plugged well in Harrison County, plugged December 19, 2019, last operated by Shelby Operating Company.

The RRC has issued one drilling permit, issued May 20, 1991, permitted to 10,000 ft.

It was permitted by Winchester Production Company and has since transferred to Shelby Operating Company on the wellbore schedule.

Completion filings report 4 formation tops, including Massive Anhydrite (marker), Pettit, Travis Peak, Cotton Valley.

Its lease has reported 5.97K barrels of oil and 698K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Shelby Operating Company

Permitted by Winchester Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Mar 4, 2026
Permits on file
86
Phone
(214) 739-5384

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShelby Operating Company
Production reportsShelby Operating Companythrough Mar 2007
Latest permitWinchester Production CompanyMay 20, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,000
total depth, ft
1
permits on file
May 20, 1991
last permit issued
Sep 19, 1991
completed
5.97K
cumulative oil, bbl
698K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 19, 1991
Shut in
—
Plugged
Dec 19, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Massingale, James G-6-139450Waskom (Cotton Valley)Shelby Operating Company15.97K698KJan 1993 – Mar 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Winchester Production CompanyJan 1993 → Mar 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387946-99DrillWinchester Production CompanyMay 15, 1991May 20, 1991Jun 15, 199110,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 19, 1991Massingale James G-6-139450Waskom (Cotton Valley)Shelby Operating CompanyPlugged—

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,462
Pettit5,532
Travis Peak5,842
Cotton Valley7,815

Perforations

Perforated and open-hole intervals.

FromToType
7,9207,932Perforated
9,2799,526Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00311290 S
4.59,6507.8751,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 15, 1993Feb 18, 1993—
00Oct 15, 1991Sep 30, 1991Yes
00Oct 9, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332013, documented in the API reference.