TEXAS · WELLS · HARRISON COUNTY · GEORGE, T.W. GAS UNIT "A" LEASE · API 42-203-32092 · DISTRICT 06

George T.W. Gas Unit A #2

Y

Harrison County · Blocker (Cotton Valley) field · Producing  · Vertical

George T.W. Gas Unit A #2 (API 42-203-32092) is a well in Harrison County operated by Mmgl East Texas Iii LLC, completed June 25, 1992 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1992 and 2015, permitted to 10,277 ft.

It was permitted by BP America Production Company and has since transferred to Mmgl East Texas Iii LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Mmgl East Texas III LLC

Permitted by BP America Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Sep 3, 2025
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMmgl East Texas III LLC
Production reportsMmgl East Texas III, LLCthrough Apr 2026
Latest permitBP America Production CompanyAug 31, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,277
total depth, ft
3
permits on file
Aug 31, 2015
last permit issued
Jun 25, 1992
completed
0
cumulative oil, bbl
1.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 25, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
George, T.W. Gas Unit "A" G-6-141721Blocker (Cotton Valley)Mmgl East Texas III, LLC101.17MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 16,747 · prior 12 12,661(+32%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Feb 2022
  3. 3BPX Operating CompanyMar 2022 → Oct 2024
  4. 4Mmgl East Texas III, LLCNov 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
809864-99RecompletionBP America Production CompanyAug 27, 2015Aug 31, 2015—10,277
395489-98DrillAmoco Production CompanyFeb 21, 1992Jan 2, 1992Apr 13, 199210,800
395489-99DrillAmoco Production CompanyDec 30, 1991Jan 2, 1992—10,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 25, 1992George T.W. Gas Unit A G-6-141721Blocker (Cotton Valley)Mmgl East Texas III LLCProducing10,277

Formation tops

As filed on W-2/G-1. Subsea from 344 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE5,422-5,078
Rodessa5,752-5,408
Pettit6,452-6,108
Travis Peak6,728-6,384
Cotton Valley8,768-8,424
BossierBOSSIER SHALE10,165-9,821

Perforations

Perforated and open-hole intervals.

FromToType
9,9009,920Perforated
9,9629,982Perforated
10,01010,025Perforated
10,07610,098Perforated
10,10610,120Perforated
10,14010,160Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,81417.51,250 S
8.6253,97512.251,550 S
5.510,2777.8751,220 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 1992Jul 8, 1992Yes
00Jul 31, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332092, documented in the API reference.