TEXAS · WELLS · HARRISON COUNTY · SHEPPARD-ANNE -A- LEASE · API 42-203-32493 · DISTRICT 06
Sheppard-Anne -A- #2
Harrison County · Blocker (Richardson Sand) field · Shut In · Vertical
Sheppard-Anne -A- #2 (API 42-203-32493) is a well in Harrison County operated by Buffco Production Inc., completed March 12, 1998 and listed as shut in on the RRC schedule, shut in January 1, 1998.
The RRC has issued one drilling permit, issued December 31, 1997, permitted to 6,752 ft.
Completion filings report 4 formation tops, including Massive, Rodessa, Pettit, Travis Peak.
Its lease has reported 934 mcf of gas since March 1998, with no volume in the three years through April 2026.
Operator of record
- Based in
- Longview, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 14, 2025
- Permits on file
- 397
- Phone
- (903) 988-8199
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Buffco Production Inc. |
| Production reports | Buffco Production Inc.through Nov 2006 |
| Latest permit | Buffco Production Inc.Dec 31, 1997 |
- 6,752
- total depth, ft
- 1
- permits on file
- Dec 31, 1997
- last permit issued
- Mar 12, 1998
- completed
- 0
- cumulative oil, bbl
- 934
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2006 THROUGH Nov 2006
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 12, 1998
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheppard-Anne -A- O-6-13861 | Blocker (Richardson Sand) | Buffco Production Inc. | 1 | 0 | 934 | Mar 1998 – Nov 2006 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 471529-99 | Drill | Buffco Production Inc. | Dec 22, 1997 | Dec 31, 1997 | Feb 2, 1998 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 12, 1998 | Sheppard-Anne -A- O-6-13861 | Blocker (Richardson Sand) | Buffco Production Inc. | Shut In · shut in Jan 1, 1998 | 6,752 |
Formation tops
As filed on W-2/G-1. Subsea from 287 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive | 5,100 | -4,813 |
| Rodessa | 5,460 | -5,173 |
| Pettit | 6,040 | -5,753 |
| Travis Peak | 6,460 | -6,173 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,500 | 6,523 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 645 | 11 | 202 S |
| 5.5 | 6,752 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1999 | Oct 9, 1998 | Yes |
| 00 | Nov 16, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-32493 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-32493 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20332493, documented in the API reference.