TEXAS · WELLS · HARRISON COUNTY · API 42-203-32690 · DISTRICT 06

Scott JO Ann #1

Shut in

Harrison County · Bethany (Travis Peak Cons.) field · Temp Abandoned  · Vertical

Scott JO Ann #1 (API 42-203-32690) is a well in Harrison County operated by Enpower Resources Inc., completed July 26, 2001 and listed as temp abandoned on the RRC schedule, shut in June 1, 2021.

The RRC has issued one drilling permit, issued June 8, 2001, permitted to 9,986 ft.

It was permitted by Gmx Resources Inc. and has since transferred to Enpower Resources Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Enpower Resources Inc.

Permitted by GMX Resources Inc.; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Oct 17, 2025
Phone
(832) 933-1678

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnpower Resources Inc.
Production reportsEnpower Resources Inc.through May 2021
Latest permitGMX Resources Inc.Jun 8, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,986
total depth, ft
1
permits on file
Jun 8, 2001
last permit issued
Jul 26, 2001
completed
0
cumulative oil, bbl
455K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 26, 2001
Shut in
Jun 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Scott, JO Ann G-6-186958Bethany (Travis Peak Cons.)Enpower Resources Inc.10288KJul 2001 – Jul 2026
Scott, JO Ann G-6-186959Carthage, North (Cotton Valley)Enpower Resources Inc.10167KJul 2001 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1GMX Resources Inc.Aug 2001 → Aug 2012
  2. 2East Texas Exploration, LLCSep 2012 → Sep 2019
  3. 3Enpower Resources Inc.Oct 2019 → May 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510036-99DrillGMX Resources Inc.Jun 8, 2001Jun 8, 2001Jun 18, 200110,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 26, 2001Scott JO Ann G-6-186959Carthage North (Cotton Valley)Enpower Resources Inc.Temp Abandoned · shut in Mar 1, 20059,986
Jul 26, 2001Scott JO Ann G-6-186958Bethany (Travis Peak Cons.)Enpower Resources Inc.Temp Abandoned · shut in Jun 1, 20219,986

Formation tops

As filed on W-2/G-1. Subsea from 311 ft elevation.Download CSV →

FormationMD ftSubsea
Pettit6,035-5,724
Travis Peak6,348-6,037
Cotton Valley8,265-7,954

Perforations

Perforated and open-hole intervals.

FromToType
6,6056,617Perforated
9,2249,764Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,60512.25500 S
75,8008.75765 S
4.59,9856.125425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 2002Jan 16, 2002Yes
00Mar 6, 2002Jan 16, 2002Yes
00Feb 25, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332690, documented in the API reference.