TEXAS · WELLS · HARRISON COUNTY · WOOD LEASE · API 42-203-32760 · DISTRICT 06
Wood #1
Harrison County · Woodlawn (Cotton Valley) field · Producing · Vertical
- Fields on the latest permit · any of 12
- Woodlawn · Woodlawn (Cotton Valley) · Woodlawn (Hill) · Woodlawn (Nugent) · Woodlawn (Pettit-Page) · Woodlawn (Pettit 6500) · Woodlawn (Rodessa) · Woodlawn (Transition) · Woodlawn (Travis Peak) · Woodlawn (Travis Peak -A-) · Woodlawn E. (Page 6320) · Woodlawn, E. (Page 6460)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
Wood #1 (API 42-203-32760) is a well in Harrison County operated by Diversified Production LLC, completed January 31, 2003 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued November 6, 2002, permitted to 10,050 ft.
It was permitted by Howell Oil & Gas, Inc. and has since transferred to Diversified Production LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime, Pettit.
Its lease has reported 9.52K barrels of oil and 309K mcf of gas since January 2003, last reporting volume in April 2026.
Operator of record
Permitted by Howell Oil & Gas, Inc.; the EWA schedule now lists a different operator.
- Based in
- Keithville, LA
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 25, 2026
- Permits on file
- 11
- Phone
- (318) 751-3917
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Diversified Production LLC |
| Production reports | Diversified Production LLCthrough Apr 2026 |
| Latest permit | Howell Oil & Gas, Inc.Nov 6, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,050
- total depth, ft
- 1
- permits on file
- Nov 6, 2002
- last permit issued
- Jan 31, 2003
- completed
- 9.52K
- cumulative oil, bbl
- 309K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2003 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 31, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood G-6-193629 | Woodlawn (Cotton Valley) | Diversified Production LLC | 1 | 9.52K | 309K | Jan 2003 – Apr 2026 |
Gas, mcf lease total
Last 12 months 682 · prior 12 297(+130%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Howell Oil & Gas, Inc.Feb 2003 → Sep 2007
- 2NFR Energy, LLCOct 2007 → Jan 2013
- 3Sabine Oil & Gas LLCFeb 2013 → Mar 2015
- 4Sabine Oil & Gas CorporationApr 2015 → Dec 2020
- 5Crescent Pass Energy, LLCJun 2021 → Aug 2024
- 6Diversified Production LLCSep 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 525283-99 | Drill | Howell Oil & Gas, Inc. | Nov 6, 2002 | Nov 6, 2002 | Nov 6, 2002 | 10,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 31, 2003 | Wood G-6-193629 | Woodlawn (Cotton Valley) | Diversified Production LLC | Producing | 10,050 |
Formation tops
As filed on W-2/G-1. Subsea from 225 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 5,180 | -4,955 |
| Rodessa | 5,565 | -5,340 |
| James Lime | 6,105 | -5,880 |
| Pettit | 6,235 | -6,010 |
| Travis Peak | 6,500 | -6,275 |
| Cotton Valley | 8,150 | -7,925 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,464 | 9,806 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,026 | 11 | 281 S |
| 4.5 | 10,050 | 7.875 | 1,470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 25, 2003 | Mar 7, 2003 | Yes |
| 00 | Apr 7, 2003 | — | — |
Well logs
The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.
Open the RRC's log search for this well ↗The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-32760 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-32760 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20332760, documented in the API reference.