TEXAS · WELLS · HARRISON COUNTY · API 42-203-33361 · DISTRICT 06

Sandra Beth #1

Permitted

Harrison County  · Vertical

Permitted fields · any of 12
Longwood · Longwood (Cotton Valley) · Longwood (Goodland Lime) · Longwood (Travis Peak) · Lotta (Cotton Valley) · Waskom (Cotton Valley) · Waskom (Cotton Valley, Oil) · Waskom (Cotton Valley, Up.) · Waskom (Cotton Valley 8100) · Waskom (Cotton Valley 8300) · Waskom (6400 Travis Peak) · Waskom (6500 Travis Peak)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Sandra Beth #1 (API 42-203-33361) is a permitted well in Harrison County filed by Matador Production Company; no completion report is on file yet.

The RRC has issued one drilling permit, issued December 12, 2005, permitted to 10,500 ft.

Permit operator

Matador Production Company

The RRC's wellbore file has no operator of record for it yet; this is the operator on its permit.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMatador Production CompanyDec 12, 2005
10,500
total depth, ft
1
permits on file
Dec 12, 2005
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
610420-99DrillMatador Production CompanyDec 2, 2005Dec 12, 2005—10,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20333361, documented in the API reference.