WELL · 42-203-34422 · DISTRICT 6
Joiner J.W. GU 1 #5
Harrison County · Carthage (Haynesville Shale) field · Vertical
Joiner J.W. GU 1 #5 (API 42-203-34422) is a plugged well in Harrison County, plugged June 28, 2018, last operated by Rockcliff Energy Operating LLC.
The RRC has issued 2 drilling permits (amended once) between 2008 and 2010, permitted to 13,000 ft.
It was permitted by Samson Lone Star, LLC and has since transferred to Rockcliff Energy Operating LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.
Operator of record
Rockcliff Energy Operating LLC
Permitted by Samson Lone Star, LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Sep 29, 2025
- Permits on file
- 569
- Phone
- (713) 351-0534
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rockcliff Energy Operating LLC |
| Production reports | Rockcliff Energy Operating LLCthrough Jun 2018 |
| Latest permit | Samson Lone Star, LLCFeb 25, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,000
- total depth, ft
- 3
- permits on file
- Feb 25, 2010
- last permit issued
- Jan 31, 2009
- completed
- 0
- cumulative oil, bbl
- 532K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Jun 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 31, 2009
- Shut in
- —
- Plugged
- Jun 28, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Joiner, J.W. GU 1 G-6-247341 | Waskom (Haynesville) | Rockcliff Energy Operating LLC | 1 | 0 | 192K | Jan 2009 – Jun 2018 |
| Joiner, J.W. GU 1 G-6-255347 | Waskom (Cotton Valley) | Rockcliff Energy Operating LLC | 1 | 0 | 341K | Mar 2009 – Jun 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samson Lone Star, LLCJan 2009 → Sep 2017
- 2Rockcliff Energy Operating LLCOct 2017 → Jun 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 691511-99 | Recompletion | Samson Lone Star, LLC | Feb 18, 2010 | Feb 25, 2010 | Mar 2, 2009 | 11,342 |
| 659626-98 | Drill | Samson Lone Star, LLC | Nov 13, 2008 | Apr 28, 2008 | Nov 10, 2008 | 13,000 |
| 659626-99 | Drill | Samson Lone Star, LLC | Apr 15, 2008 | Apr 28, 2008 | Nov 10, 2008 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-247341 | — | — | — | — |
| — | — G-6-255347 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 320 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 5,194 | -4,874 |
| James Lime | 5,648 | -5,328 |
| Pettit | 5,950 | -5,630 |
| Travis Peak | 6,245 | -5,925 |
| Cotton Valley | 8,184 | -7,864 |
| Bossier | 9,786 | -9,466 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,550 | 11,149 | Perforated |
| 10,851 | 11,149 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 498 | 12.25 | 350 S |
| 4.5 | 11,342 | 8.75 | 1,820 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 14, 2010 | Mar 1, 2010 | — |
| 00 | Apr 16, 2010 | — | — |
| 00 | Jun 15, 2009 | May 4, 2009 | Yes |
| 00 | May 28, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-34422 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-34422 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20334422, documented in the API reference.