TEXAS · WELLS · HARRISON COUNTY · API 42-203-34456 · DISTRICT 06
Yates GU 1 #1
Harrison County · Waskom (Cotton Valley) field · SWR-10-Well · Vertical
Yates GU 1 #1 (API 42-203-34456) is a well in Harrison County operated by Tgnr East Texas II LLC, completed October 23, 2008 and listed as swr-10-well on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued May 19, 2008, permitted to 11,756 ft.
It was permitted by Samson Lone Star, LLC and has since transferred to Tgnr East Texas II LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Glen Rose, Rodessa, James Lime, Pettit.
Its 2 leases have reported 7.14K barrels of oil and 742K mcf of gas since August 2008, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Samson Lone Star, LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 162
- Phone
- (346) 308-2250
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR East Texas II LLC |
| Production reports | TGNR East Texas II LLCthrough Apr 2026 |
| Latest permit | Samson Lone Star, LLCNov 4, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,756
- total depth, ft
- 2
- permits on file
- Nov 4, 2008
- last permit issued
- Oct 23, 2008
- completed
- 7.14K
- cumulative oil, bbl
- 742K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 23, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Yates GU 1 G-6-243369 | Carthage (Haynesville Shale) | TGNR East Texas II LLC | 1 | 7.14K | 742K | Aug 2008 – Apr 2026 |
| Yates GU 1 G-6-250723 | Waskom (Cotton Valley) | TGNR East Texas II LLC | 1 | 0 | 0 | Oct 2008 – — |
Gas, mcf lease total
Last 12 months 10,829 · prior 12 16,510(-34%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Samson Lone Star, LLCAug 2008 → Sep 2017
- 2Rockcliff Energy Operating LLCOct 2017 → Nov 2023
- 3TGNR East Texas II LLCDec 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 660808-98 | Drill | Samson Lone Star, LLC | Oct 30, 2008 | Nov 4, 2008 | Jun 28, 2008 | 13,000 |
| 660808-99 | Drill | Samson Lone Star, LLC | Apr 30, 2008 | May 19, 2008 | Jun 28, 2008 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 23, 2008 | Yates GU 1 G-6-250723 | Waskom (Cotton Valley) | TGNR East Texas II LLC | SWR-10-Well · shut in Oct 1, 2008 | 11,756 |
| Aug 26, 2008 | Yates GU 1 G-6-243369 | Carthage (Haynesville Shale) | TGNR East Texas II LLC | Producing | 11,756 |
Formation tops
As filed on W-2/G-1. Subsea from 280 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen Rose | 3,452 | -3,172 |
| Rodessa | 5,230 | -4,950 |
| James Lime | 5,692 | -5,412 |
| Pettit | 5,979 | -5,699 |
| Travis Peak | 6,279 | -5,999 |
| Cotton Valley | 8,098 | -7,818 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,436 | 11,651 | Perforated |
| 11,650 | 11,651 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 467 | 12.25 | 400 S |
| 4.5 | 11,756 | 8.75 | 1,690 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2009 | Aug 17, 2009 | — |
| 00 | Sep 4, 2009 | — | — |
| 00 | Jan 20, 2009 | Oct 16, 2008 | Yes |
| 00 | Jan 2, 2009 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received Aug 2, 2011. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Glen Rose, Rodessa, James Lime, Pettit, Travis Peak, Cotton Valley | TIFF | 4,800 to 11,766 | Aug 2, 2011run Jul 9, 2008 | 4.21 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-34456 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-34456 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.