TEXAS · WELLS · HARRISON COUNTY · CARTER RANCH LEASE · API 42-203-34808 · DISTRICT 06

Carter Ranch #1

Shut in

Harrison County · Carthage (Haynesville Shale) field · Temp Abandoned  · Vertical

Carter Ranch #1 (API 42-203-34808) is a well in Harrison County operated by Rfe Operating LLC, completed January 1, 2014 and listed as temp abandoned on the RRC schedule, shut in March 1, 2025.

The RRC has issued one drilling permit, issued March 6, 2009, permitted to 12,298 ft.

It was permitted by Unit Petroleum Company and has since transferred to Rfe Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), James Lime, Travis Peak, Bossier.

No lease production has been reported under this well’s leases.

Operator of record

RFE Operating LLC

Permitted by Unit Petroleum Company; the EWA schedule now lists a different operator.

Based in
Tyler, TX
P-5 status
Active (A)
P-5 last filed
Jan 8, 2026
Permits on file
135
Phone
(903) 730-6080

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRFE Operating LLC
Production reportsRFE Operating, LLCthrough Feb 2025
Latest permitUnit Petroleum CompanyMar 6, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,298
total depth, ft
1
permits on file
Mar 6, 2009
last permit issued
Jan 1, 2014
completed
0
cumulative oil, bbl
126K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 1, 2014
Shut in
Mar 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carter Ranch G-6-253792Carthage, North (Bossier Shale)RFE Operating, LLC10126KAug 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 957(-100%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Unit Petroleum CompanyAug 2009 → Sep 2013
  2. 2Fortune Resources LLCOct 2013 → Jul 2022
  3. 3RFE Operating, LLCAug 2022 → Feb 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
678861-99DrillUnit Petroleum CompanyFeb 24, 2009Mar 6, 2009Mar 23, 200912,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 1, 2014Carter Ranch G-6-253792Carthage (Haynesville Shale)RFE Operating LLCTemp Abandoned · shut in Mar 1, 202512,298

Formation tops

As filed on W-2/G-1. Subsea from 396 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE6,376-5,980
James LimeJAMES LIMESTONE7,113-6,717
Travis Peak7,556-7,160
BossierBOSSIER SHALE10,874-10,478
HaynesvilleHAYNESVILLE SHALE11,799-11,403
Cotton ValleyCOTTON VALLEY LIMESTONE12,089-11,693

Perforations

Perforated and open-hole intervals.

FromToType
11,82211,920Perforated
11,92612,092Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,13612.25420 S
5.512,2988.751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 21, 2014Jan 21, 2014—
00Feb 17, 2010Nov 4, 2009Yes
00Jan 5, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20334808, documented in the API reference.