TEXAS · WELLS · HARTLEY COUNTY · BALFOUR LEASE · API 42-205-30175 · DISTRICT 08

Balfour #9

Plugged

Hartley County · Panhandle West field  · Vertical

Balfour #9 (API 42-205-30175) is a plugged well in Hartley County, plugged March 29, 2012, last operated by Conocophillips Company.

The RRC has issued one drilling permit, issued March 21, 1986, permitted to 3,750 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Conocophillips Company on the wellbore schedule.

Completion filings report 3 formation tops, including Panhandle Lime, Brown Dolomite, Moore County Lime.

Its lease has reported 305K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Conocophillips Company

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 3, 2026
Permits on file
3,290
Phone
(432) 683-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConocophillips Company
Production reportsConocophillips Companythrough Jul 2011
Latest permitPhillips Petroleum CompanyMar 21, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,750
total depth, ft
1
permits on file
Mar 21, 1986
last permit issued
May 26, 1986
completed
0
cumulative oil, bbl
305K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 26, 1986
Shut in
—
Plugged
Mar 29, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Balfour G-14-121559Panhandle, WestConocophillips Company10305KJan 1993 – Jul 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Jul 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
300177-99DrillPhillips Petroleum CompanyMar 21, 1986Mar 21, 1986Mar 28, 19863,750

Completions

CompletedLeaseFieldOperatorStatusDepth
May 26, 1986Balfour G-14-121559Panhandle WestConocophillips CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,807 ft elevation.Download CSV →

FormationMD ftSubsea
Panhandle Lime3,043764
Brown Dolomite3,256551
Moore County Lime3,551256

Perforations

Perforated and open-hole intervals.

FromToType
3,3783,386Perforated
3,3923,402Perforated
3,4183,422Perforated
3,4343,446Perforated
3,4583,478Perforated
3,5063,536Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,90112.251,062 S
5.53,6577.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 18, 1986Jun 12, 1986Yes
00Jul 9, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20530175, documented in the API reference.