WELL · 42-207-32150 · DISTRICT 8

Double Mountain Unit #1016

Plugged

Haskell County  · Vertical

Double Mountain Unit #1016 (API 42-207-32150) is a plugged well in Haskell County, plugged June 6, 1991, last operated by Spindletop Oil&Gas Company.

The RRC has issued one drilling permit (amended once), issued May 21, 1991, permitted to 5,999 ft.

Operator of record

Spindletop Oil&gas Company

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Oct 1, 2025
Permits on file
180
Phone
(972) 644-2581

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitSpindletop Oil&gas CompanyMay 21, 1991
5,999
total depth, ft
2
permits on file
May 21, 1991
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jun 6, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387945-98DrillSpindletop Oil&gas CompanyMay 24, 1991May 21, 1991May 28, 19914,999
387945-99DrillSpindletop Oil&gas CompanyMay 15, 1991May 21, 1991—5,999

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20732150, documented in the API reference.