TEXAS · WELLS · HASKELL COUNTY · HENDRICK H-16/328 LEASE · API 42-207-32376 · DISTRICT 6E
Hendrick H-16/328 #2
Haskell County · Haskell County Regular field · Vertical
Hendrick H-16/328 #2 (API 42-207-32376) is a plugged well in Haskell County, plugged January 20, 2016, last operated by Stovall Operating CO..
The RRC has issued one drilling permit, issued May 23, 1997, permitted to 2,000 ft.
Completion filings report one formation top, including Swastika.
Its lease has reported 24.3K barrels of oil since March 1996, with no volume in the three years through April 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 25, 2025
- Permits on file
- 259
- Phone
- (940) 549-2616
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Stovall Operating Co. |
| Production reports | Stovall Operating Co.through Mar 2009 |
| Latest permit | Stovall Operating Co.May 23, 1997 |
- 2,000
- total depth, ft
- 1
- permits on file
- May 23, 1997
- last permit issued
- Jun 18, 1997
- completed
- 24.3K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1996 THROUGH Mar 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 18, 1997
- Shut in
- —
- Plugged
- Jan 20, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hendrick H-16/328 O-8-27796 | Haskell County Regular | Stovall Operating Co. | 3 | 24.3K | 0 | Mar 1996 – Mar 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stovall Operating Co.Apr 1996 → Mar 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 462789-99 | Drill | Stovall Operating Co. | May 22, 1997 | May 23, 1997 | May 23, 1997 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 18, 1997 | Hendrick H-16/328 O-8-27796 | Haskell County Regular | Stovall Operating Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,622 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Swastika | 1,770 | -148 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,770 | 1,777 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,770 | 6.75 | 255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 1997 | Jul 16, 1997 | — |
| 00 | Jul 23, 1997 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-207-32376 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-207-32376 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20732376, documented in the API reference.