WELL · 42-207-32870 · DISTRICT 7
Elliott #1
Haskell County · Vertical
Elliott #1 (API 42-207-32870) is a permitted well in Haskell County filed by Pmo; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2014 and 2017, permitted to 7,000 ft.
Completion filings report 10 formation tops, including Unidentified-County Regular - Di, Strawn, Coleman Junction, Cook Sand - Disposal.
Its lease has reported 14.4K barrels of oil since July 2017, last reporting in July 2026.
Operator of record
Garland, TX · P-5 Y, filed Jul 3, 2020 · 171 permits on file · (940) 203-0291
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Yeti Exploration, LLCthrough Apr 2026 |
| Latest permit | PmoMar 13, 2017 |
- 7,000
- total depth, ft
- 2
- permits on file
- Mar 13, 2017
- last permit issued
- —
- completed
- 14.4K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2017 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Elliott O-8-32159 | Louis Lake (Caddo) | Yeti Exploration, LLC | 1 | 14.4K | 0 | Jul 2017 – Jul 2026 |
Oil, barrels lease total
Last 12 months 761 · prior 12 568(+34%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1PmoSep 2017 → Dec 2017
- 2CH4 Energy Six, LLCJan 2018 → May 2020
- 3Yeti Exploration, LLCJun 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 824119-99 | Drill | Pmo | Mar 6, 2017 | Mar 13, 2017 | May 29, 2017 | 7,000 |
| 801150-99 | Drill | CH4 Energy II, LLC | Dec 3, 2014 | Dec 4, 2014 | — | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-32159 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,500 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Unidentified-County Regular - DI | 800 | 700 |
| StrawnSTRAWN - DISPOSAL | 1,160 | 340 |
| Coleman Junction | 1,500 | 0 |
| Cook Sand - Disposal | 1,590 | -90 |
| Swastika - Disposal | 1,850 | -350 |
| TannehillTANNEHILL SAND - DISPOSAL | 2,410 | -910 |
| King Sand - Disposal | 2,750 | -1,250 |
| GunsightGUNSIGHT LIME - DISPOSAL | 2,840 | -1,340 |
| CiscoCISCO SAND - DISPOSAL | 3,210 | -1,710 |
| CanyonCANYON - DISPOSAL | 3,290 | -1,790 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,373 | 5,383 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12.25 | 75 S |
| 4.5 | 5,450 | 7.875 | 260 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 19, 2017 | Aug 18, 2017 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-207-32870 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-207-32870 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20732870, documented in the API reference.